Laserfiche WebLink
ATTACHMENT G <br />Piroi6ct Cost All SCCP funds reqjested to be. programmedin., Fiswl Year 20.2.0.-21. <br />Fund <br />SB1_3CCP_'_ <br />Total <br />Source/Phase <br />(000io) <br />Construction <br />$343,987 <br />$343,987 <br />Total <br />$343,987 <br />:$343,987 <br />Protect Schedule <br />mflestaiI6 <br />Date <br />Planned Construction Allocation <br />6/115/2021 <br />Construction Contract Award <br />12/15/2021 <br />Construction Coh)olbtibh <br />112/1572Q22� <br />Project Closeout <br />12/1512023 <br />Benefits <br />• Provides real time information on noxtbus arriving at bus; stops improving service <br />to riders. <br />• Identifies bus stop as a Bravo! Main stop and advertisesthp-service. <br />• Provides additioriall protection and. comfort for passengers waiting at up to two of <br />the stops. <br />• Mode shift from short lo��al vehicular trips will redoce:CO2.emlssions. <br />• Connects ts to the Anaheim Regional Transportation Intermodal Center (ARTIC), <br />which provide$, services to Metrolink and the Amtrak Pacific, -Surf! iner into Los <br />Angeles, Riverside, San Bernardino, :$an Diego, Ventura,, and into San Luig <br />Obispo., <br />Connects to.John Wayne International Airport (SNA). <br />Connecting QC. Bus routes including 153, 206, 215, 4531.463,.473, 50, 64, 55,56, <br />K 60, 64, 66., 70; 71, 72,. 7.6.1 79, 794, 83, 86; 862, and Bravo! 560 rapid bus. <br />