Laserfiche WebLink
ATTACHMENT B <br />Benefits <br />Provides access and connections to schools, parks, commercial centers, and <br />residential areas. <br />• Provides connections to OC Bus Routes 59 and 71 which run along the Orange <br />County Central Corridor Project area <br />• Reduces conflict points by connecting to existing overcrossing of State Route 55 <br />Freeway <br />• Provides enhanced safety for both cyclists and pedestrians with safety benefits of <br />$0.9 million over 20 years <br />• Mode shift from short local vehicular trips reduces CO2 emissions by 3.9 tons per <br />year <br />• The project has a benefit cost ratio of 1.1 <br />• Provides health benefits of $2.5 million over 20 years. <br />Additional Visuals <br />Image Above: East Santa Clara Avenue between Tustin Avenge and Ridgewood Avenue facing <br />West <br />image Above: East Santa Clara Avenue at the intersection of Wright Street. Location of future <br />pedestrian crossing and signal. <br />