My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 22 - Solutions for Congested Corridors Program
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/02/2021 Regular
>
Item 22 - Solutions for Congested Corridors Program
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 1:48:24 PM
Creation date
8/22/2023 7:47:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
22
Date
3/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT B <br />Benefits <br />Provides access and connections to schools, parks, commercial centers, and <br />residential areas. <br />• Provides connections to OC Bus Routes 59 and 71 which run along the Orange <br />County Central Corridor Project area <br />• Reduces conflict points by connecting to existing overcrossing of State Route 55 <br />Freeway <br />• Provides enhanced safety for both cyclists and pedestrians with safety benefits of <br />$0.9 million over 20 years <br />• Mode shift from short local vehicular trips reduces CO2 emissions by 3.9 tons per <br />year <br />• The project has a benefit cost ratio of 1.1 <br />• Provides health benefits of $2.5 million over 20 years. <br />Additional Visuals <br />Image Above: East Santa Clara Avenue between Tustin Avenge and Ridgewood Avenue facing <br />West <br />image Above: East Santa Clara Avenue at the intersection of Wright Street. Location of future <br />pedestrian crossing and signal. <br />
The URL can be used to link to this page
Your browser does not support the video tag.