Laserfiche WebLink
� W PROPOSED � _ <br />TUSTIN AVE <br />PROPOSED PROPOSED - <br />SIDEWALK BIKEWAY CURB RADIUS . '. CURB RADIUS <br />�1� ! + I REDUCTION REDUCTIONSANTA CLARA AVE <br />-� — <br />i­SANTA CLARA A <br />- - .�' - ,ate r a" _•-"��---------------- <br />SANTA CLARA AVE - LYON ST TO TUSTIN <br />EXISTING CONDITIONS <br />16' 8' 8' <br />SIDEWALK DRIVE LANE CENTS DRIVE LANE PARKING SIDEWALK <br />TURN <br />LANE <br />l � V _ <br />PROPOSED <br />BIKEWAY <br />SANTA CLARA AVE - LYON ST TO TUSTIN <br />PROPOSED CONDITIONS <br />ab • <br />C: <br />;DM j N� DDR�� CTURN DAPo E N, ;� PARKING SIDEWALK <br />m LANE <br />vj <br />N .. <br />1 <br />REVISIONS <br />REFERENCES <br />DATE <br />07-01-18 <br />PROPOSED PROJECT U <br />SANTA CLARA AVENUE FROM <br />LINCOLN STREET TO TUSTIN AVENUE W <br />DESCRIPTION <br />APPROVED <br />INSTALLED <br />BENCHMARK NO.: XX-XXX-XX ELEV.: NNN. NNE NAVDYY <br />BENCHMARK DESCRIPTION <br />DESIGNED: MC/RC DRAWN: MC/RC CHECKED: ZK <br />07-01-18 <br />RECODED: <br />:EIIITIIIS <br />RECOCOMMENDDED FOR CONSTRUCTION: <br />o7-ot-1e <br />PUBLIC WORKS AGENCY C <br />CITY OF SANTA ANA <br />CONSTRUCTION COMPLETED: <br />Attach me Mt chment D <br />