|
!� WATI
<br />Delivering Excellence, since 1998
<br />West Advanced Technologies, Inc.
<br />1010 Hurley Way, Suite 245, Sacramento, CA 95825
<br />161 Fort Evans Rd NE, Suite 235, Leesburg, VA 20176
<br />1230 Rosecrans Ave, Suite 300, Manhattan Beach, CA 90266
<br />• Mana ❑ed and de Glop tEb securit ❑ re C3lirements for tEb I ❑ Mana Cbment S er ices CD ❑SM ❑
<br />• Capacit ❑ Plannin ❑ Mana Cbment ❑ Billin ❑ S CStem
<br />• Mana ❑ed t C� C3ialit ❑ assurance team durin ❑ t ❑e re C3tirements, desi Eh and de ❑elopment p E ses of
<br />t Cis C3i Cb transformation of a le Ek ❑ mainframe s Cstem to ❑2 ❑ ❑ tec Cholo Lies.
<br />• Spear Cbaded tEb testin ❑ of ne ❑ desiEh met ❑bdolo Lies usin ❑ ❑M ❑ for tEb tec Chical specifications
<br />of t Cb s Ekem. Desi Ched t Cb entire s 113tem usin ❑ a ❑2 ❑❑ scalable n-tier arc ❑itecture based on best
<br />practices and desi C3i patterns.
<br />• ❑ec Eholo FTFa C- FF? ❑❑C❑CB, ❑ eblo C3c, ❑11E7 ESP, Struts, Oracle dB
<br />• ❑eamE32 11❑111� CPM, De❑elopers, ❑ualit❑ ❑ssurance, Business ❑nalFMs, ❑dministrators and
<br />Desi Chers ❑
<br />• Serlice Oriented ❑rclitecture [lead
<br />• Crafted an inno Cati ❑e approac ❑ to tEb SO ❑ transformation strate CI7to Cblp clients ❑it ❑t ❑eir
<br />SO El roadmap. ❑Cis ❑or❑became tEb foundation for a ne❑ serCice line CIA ❑as Cbr❑ ❑ell
<br />receiEbd b [It E� clients.
<br />Technology: a CYE2 ❑E7 SO[], Oracle, HIP ❑ ❑, CSP Struts, PMI, ❑IS E7 I CAI ❑, ❑O ❑ ❑ g CMMI.
<br />Team: 50 ❑❑❑S [Mana❑ers, DeCblopers, Product ManaCbrs, Data ❑rcCitects, ❑dministrators❑
<br />Al -Faris Information Technologies, Al -Kuwait, Kuwait
<br />Director of Software Development
<br />Aug 2002 to Aug 2005
<br />One of tEb earl ❑ leaders in e-Commerce, ❑financial solutions, responsible for establis Can ❑t Cb tec C3iolo C❑7
<br />department tEM deCeloped tEb main product. ❑cEieCbments include❑
<br />• Clstablis Cbd and mana Cbd a ne ❑ soft ❑ are de Cblopment department of about 30 emplo ❑ees in
<br />product manaCbment, soft❑are deCblopment, and database administration. Successfull❑
<br />deli Cored t Cb first release of t C3s compan ETA main product on time and ❑it Can bud Cat.
<br />• DriCon projects to ac Cie Cb pre -determined product Ciialit q on -time deli Cyr ❑ per sc Cbdule and
<br />ne ❑ product de Cblopment for all ne ❑ products or t Cbir Cariance Cia process assessment and
<br />process impro ❑ements t Efou C❑but t C� product de Cblopment lifec Cole.
<br />• Mana Cod t Cb entire product lifec Cole from inception t CTou CI7 deplo Ement and maintenance.
<br />Pro Cided arc Citectural o Corsi CEt C3ialitati Cb and C3iantitati Cb leaders Cip to t Cb deli Cbr ❑ team.
<br />Hands on in Cb1 Cbment and re Cie ❑ of all ❑I desi Eh, database and code desi Eh and appro Ell of
<br />c Can Cos made to t Cb s Ckem.
<br />• ❑ s a member of t Cb e Cbcuti Cb team, pla Cod a Cb ❑ role in settin ❑ t Cb compan CI§ strate EE and
<br />direction. ❑Cb product competed fa❑brabl❑ ❑it❑major plaCbrs in tCb same space, includin❑
<br />111111, Commerce One and Oracle.
<br />• DeEOoped tEb Balanced Scorecard CBSC❑and Ile []Performance Indicators CIDPI❑for business
<br />and operations.
<br />Technology: CACIiFff?❑❑, ESP, B❑❑ ❑ eb❑oEic, Oracle, El FIE].
<br />Team: 50 ❑❑❑1� [ManaEbrs, DeFblopers, Product Mana❑ers, Data ❑rcEitects, ❑dministrators❑
<br />Contact Information for scheduling interviews: Email:srinivas@wati.com Tel: (703) 485-5715 Fax: (310) 935-3156
<br />
|