My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 20 - Authorize Agreement with Mark Thomas & Company, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
02/02/2021 Regular and Special
>
Item 20 - Authorize Agreement with Mark Thomas & Company, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 8:43:39 AM
Creation date
8/22/2023 8:43:13 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
20
Date
2/2/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT A <br />Appendix <br />ATTACHMENT 1 <br />SCOPE OF WORK <br />CITY OF SANTA ANA <br />REQUEST FOR PROPOSALS <br />FOR <br />STANDARD AVE. PROTECTED BIKE LANE AND PROTECTED INTERSECTION <br />PROJECT <br />RFP NO.: 20-113 <br />INTRODUCTION / PROJECT DESCRIPTION <br />The City of Santa Ana (City) desires to enter into an Agreement with a qualified professional <br />engineering consulting firm for the preparation PS&E package for Standard Avenue Protected <br />Bike Lane and Protected Intersection Project. <br />The proposed project will implement a Class 2 buffered bike lane along Standard Avenue from <br />Warner Avenue to Edinger Avenue, a Class 4 protected bike lane from Edinger Avenue to <br />Chestnut Avenue, and a Class 3 bicycle boulevard from Chestnut Avenue to 3rd Street. The <br />project also includes a fully protected intersection at Standard and Mcfadden as well as partial <br />protection/bulbouts at other various intersections. Signalized bicycle crossings will include <br />separate bicycle phasing and signal heads. <br />New Traffic Signal: <br />1. Standard at Bishop New Signal <br />Traffic Signal Modifications at the following locations: <br />1. Standard at Edinger Modification <br />2. Standard at Hobart Modification <br />3. Standard at McFadden Modification <br />4. Standard at Warner Bike Detection <br />5. Standard at St Gertrude Bike Detection <br />6. Standard at Chestnut Bike Detection <br />7. Standard at First Bike Detection <br />Hybrid Beacon: <br />1. Standard at Wakeham or Wisteria <br />Pedestrian improvements along the corridor include high-visibility crosswalks and bulb outs at <br />all crossings. The existing conditions along Standard Avenue includes 4-lane configuration <br />segments (two northbound lanes and two southbound lanes) and 5-lane configuration segments <br />(two northbound lanes, two southbound lanes, and a center two-way left turn lane). The majority <br />of the corridor will be reconfigured with a road diet down to a 3-lane configuration (one <br />northbound lane, one southbound lane, and a center two-way left turn lane) with bike lanes (as <br />described above) in each direction. Existing uses along the project corridor includes single <br />family and multi-family residences, schools, parks, and commercial shopping. Further by <br />connecting to an existing bicycle network this project will provide connections to Downtown <br />Santa Ana, Santa Ana College, Santa Ana Regional Transportation Center, and the Orange <br />County Civic Center. The Project also includes street resurfacing, water quality improvements, <br />City of Santa Ana RFP 20-113 <br />Page A1-1
The URL can be used to link to this page
Your browser does not support the video tag.