My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:01:23 PM
Creation date
8/22/2023 9:18:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADDENDUM No.FOUR <br />CITY OF SANTA ANA PROJECT 17-9011, 18-6911, <br />PROPOSAL 20-69.58, 21-6451 .& 19-694.0 <br />PROJECT NO.: 17-9001, 18-6911, 20-6958, 21-6451, 19-6940 <br />SOUTH MAIN STREET CORRIDOR IMPROVEMENT <br />Item <br />Description <br />Qty <br />Unit <br />Unit <br />Amount <br />Price <br />35 <br />Furnish and Install Water Valve <br />82 <br />EA <br />$ <br />$ <br />Cans and Cover <br />IN q.09 <br />j+ D, 38 <br />36 <br />Adjust Storm Drain/Sewer <br />32 <br />EA <br />$ <br />$ <br />Manhole to Grade <br />q i • of <br />37 <br />Adjust Street Light Pullbox to <br />24 <br />EA <br />$ <br />$ <br />Grade <br />12•53 <br />3o3p.'1L <br />38 <br />Adjust Traffic Signal Pullbox to <br />65 <br />EA <br />$ <br />$ <br />Grade <br />11(0 . % <br />-75L5 • ZV <br />39 <br />Adjust Existing Water Meter to <br />33 <br />EA <br />$ <br />$ <br />Grade <br />� 01,14 <br />40 <br />Adjust Existing Sewer Cleanout <br />1 <br />EA <br />$ <br />$ <br />to Grade <br />-NZ A7q_� <br />41 <br />Adjust Existing Surveying <br />5 <br />EA <br />$ <br />$ <br />Monument Well to Grade <br />�/ I z . 5-7 <br />4 162 - kS <br />42 <br />Adjust Fire Alarm Pullbox to <br />3 <br />EA <br />$ <br />$ <br />Grade <br />3q2 <br />43 <br />Construct Monument Sign <br />1 <br />EA <br />$ <br />$ <br />_ <br />q1J Ilogl <br />4 - )w . �l <br />44 <br />Construct Local Depression <br />230 <br />SF <br />$ <br />$ <br />l t -1) <br />2?3-7 <br />45 <br />Install Fire Hydrant Assembly <br />12 <br />EA <br />$ <br />$ <br />and Service <br />2�� O.�o <br />v <br />I�fS k <br />46 <br />Install Water Meter Box, Water <br />8 <br />EA <br />$ <br />$ <br />Meter and Valve <br />OD <br />47 <br />Construct Parkway Culvert Type <br />21 <br />EA <br />$ <br />$ <br />B <br />1!5�b ). -3) <br />3) 52-7•.30 <br />48 <br />Construct Parkway Drain <br />6 <br />EA <br />$ <br />$ <br />-) l 3S <br />45A16S, <br />49 <br />Relocate Existing Water Valve <br />1 <br />EA <br />$ <br />$ <br />! ,29 <br />50 <br />Relocate Traffic Signal Pullbox <br />2 <br />EA <br />$ <br />$ <br />)I-17�P <br />23y01 <br />54 <br />yinle a4e E3 s`;r" h fi <br />DELETE <br />, Pipe a <br />ITEM <br />— <br />52 <br />Construct PCC Sidewalk w/ <br />240 <br />SF <br />$ <br />$ <br />Thickened 12"Depth Edge <br />53 <br />Construct Thickened Modified <br />329 <br />LF <br />$ <br />$ <br />Curb and Gutter <br />33. fS <br />o, q*- 35 <br />54 <br />Install 30 MIL Impermeable <br />PVC Liner <br />510 <br />SQYD <br />$ <br />-1 <br />$ <br />5-09-4, 70 <br />P-3 of P-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.