My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 11 - Approve Appropriation Adjustments, Amend CIP, & Award Construction Contract South Main Street Corridor Improvements Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:01:23 PM
Creation date
8/22/2023 9:18:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
11
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />South Main Street Sewer Main Improvements <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting Improvements <br />Water <br />LOCATION MAP <br />- <br />wwaM'�;,s� <br />� <br />r <br />- <br />seae <br />p <br />- <br />:mw <br />�Ear^�s oax... € <br />x a•w .��w. $ m <br />`� <br />w�.xei¢ <br />®�w <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 20/21 CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE: <br />This project will replace existing deteriorated and over capacity <br />sewer mains, and related sewer assets, such as manholes and <br />laterals. <br />PROJECT NEED: <br />This project is required to maintain effective operation of the <br />City's sanitary sewer system, eliminate sewer main obstructions, <br />reduce sewer maintenance requirements, and prevent sewer <br />spills. <br />PROJECT COSTS FY 20121 FY 21122 FY 22123 FY 23/24 FY 24125 FY 25126 FY 26/27 <br />Construction 3,791,468 - - - - <br />TOTAL 3,791,468 - - - - - <br />SOURCE OF FUNDS FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 FY 26/27 <br />SEWER 3,791,468 - - - - - - <br />TOTAL 3,791,468 - - - - - - <br />DIVISION: <br />Water Resources <br />CONTACT: <br />Armando Fernandez, Senior Civil Engineer <br />DATE: <br />10-Dec-2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.