My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Approve Agreement for Construction Management for the South Main Street Corridor
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 12 - Approve Agreement for Construction Management for the South Main Street Corridor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:02:35 PM
Creation date
8/22/2023 9:19:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
19. Schedule and coordinate special inspection and material testing with the County of <br />Orange or other consultants. <br />20. Shall monitor and enforce prevailing wage forms and requirements for conformance to <br />the prevailing wage rates on a weekly basis. Shall verify that all Trade personnel listed in <br />the daily log are also listed in the certified payroll and shall conduct weekly employee <br />interviews, one for each trade, and submit verification with the monthly progress <br />payments. <br />21. Shall coordinate and assist the City's Community Work Force Agreement (CWA) <br />Consultant to monitor and enforce the CWA forms and requirements to ensure <br />compliance. Verification should be provided with the monthly progress payments. <br />22. The PM shall be responsible for all project closeout items, such as: As -Built plans and <br />related documentation, punch list completion, commissioning, warranty requests during <br />the one-year period. Shall schedule and oversee the warranty repair. Should include site <br />visits as requested by the City to look at defects or imperfection to determine if it is a <br />warranty issue. <br />The city reserves the right to add or reduce some of the above tasks and duties as it sees fit. The <br />consultant, serving as staff extension, shall remain sufficiently flexible to meet the needs of the <br />City and of the project. <br />PAYMENT AND INVOICING: <br />Selected Consultant shall invoice the City based on time and material according to the City's <br />standard invoice template. Tasks and hours shall be clearly identified and all rates must match <br />those included in the approved agreement. <br />CITY RESPONSIBILITIES: <br />The City will provide information in its possession relevant to the preparation of the <br />required information in the RFP. The City will provide only the staff assistance and the <br />documentation specifically in referred to herein. <br />• Furnish scope of work and provide general direction as needed for the assigned project <br />• All plan check coordination within the City <br />• Advertise, award, and administer of construction contract <br />• Electronic files (sample plans & specifications, City of Santa Ana's CADD Standards) <br />• Electronic files for title sheets and sheet borders <br />• Facilitate meeting space and coordination and City facilities <br />CONSULTANT RESPONSIBILITIES: <br />Consultant shall provide all required insurance as outlined in Attachment 2 of this RFP. <br />City of Santa Ana RFP 20-115 <br />Page Al-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.