My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 12 - Approve Agreement for Construction Management for the South Main Street Corridor
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 12 - Approve Agreement for Construction Management for the South Main Street Corridor
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:02:35 PM
Creation date
8/22/2023 9:19:02 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
12
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUTIER Ryan Weir <br />Construction Managers, Consulting Engineer Contra Ct Administrator <br />EDUCATION <br />Professional Summary <br />University of California, <br />Berkeley <br />Mr. Ryan Weir has comprehensive experience in providing document control <br />SOFTWARE/ <br />and general project assistance for heavy civil infrastructure projects. He is <br />DOCUMENT <br />responsible for directly assisting Butier's resident engineers and field <br />CONTROLS <br />inspectors with establishing project information and document control systems; <br />PROFICIENCY <br />report generation; preparation of project management and communications <br />Procore <br />manuals; preparation of meeting minutes; and client communications. He has <br />Microsoft Office Suite: <br />performed as a Document Control Specialist and Support Technician for <br />Word and Excel <br />various types of capital improvement projects, including water treatment <br />facilities, pipelines, wells, and street/roadway improvements. <br />DEDICATED TO <br />Project Experience <br />PROJECT <br />100% <br />Document Control Specialist; Simon Ranch Reservoir, Booster Pump <br />Station, and Pipeline Replacement Project; Santa Ana, CA; City of <br />Tustin (Duration: 03/2020 — 08/2021; Value: $12.6 million) —The scope of <br />work includes the following: demolition and removal of the existing reservoir <br />at Valhalla Drive and Outlook Lane; replacement of the existing reservoir with <br />a 1.0 MG circular prestressed concrete tank; replacement of existing 4", 6", <br />and 8" pipelines with new and upsized pipes; pipeline replacement in Simon <br />Ranch Road, Valhalla Drive, Racquet Hill, Via Rancho, and Vista Mar; <br />construction of 400 feet of 16-inch, 1,900 feet of 12-inch, and 200 feet of <br />8-inch Zone 3 piping, as well as 5 new fire hydrants; construction of a new <br />booster pump station at the reservoir site; replacement of asphalt at Valhalla <br />and Outlook; and grading and shoring operations. <br />Field Engineer / Document Controls, Peters Canyon Channel <br />Improvements (CIP No. 50040), City of Tustin, Department of Public <br />Works; Tustin and Irvine, CA (Completion: March 2020; Value: <br />$13,031,662)—Ryan provided field engineer/document control services for <br />the Peters Canyon Channel Improvements Project. The channel work <br />includes demolition, widening, and relining approximately 5,000 feet of the <br />existing channel within the Cities of Tustin and Irvine from north of Edinger <br />Avenue to Warner Avenue. The channel scope of work also included <br />construction of new storm drain lines, extension of existing storm drain lines, <br />and road undercrossings. Butier staff coordinated with the City of Irvine, <br />Irvine Ranch Water District, Orange County Flood Control District, Southern <br />California Gas Co., and Southern California Edison. <br />Field Engineer / Document Controls, Moffett Drive Bridge Construction <br />and Street Improvements Project; City of Tustin, Public Works <br />(Completion: 2019; Value: $5.75 million)—Butier provided construction <br />management and field inspection services for the Moffett Drive Bridge <br />Construction and Street Improvements Project. The bridge, which spans <br />across Peters Canyon Channel, connects Moffett Drive from Irvine to Tustin <br />increasing access and street connectivity within the Tustin Legacy <br />development. The scope of work included the construction of a single span <br />cast -in -place concrete box girder bridge approximately 108' long x 73.25' <br />wide. Additional scope items included the following: installation of an <br />architectural steel arch on each side of the bridge; bridge lighting; grading; <br />
The URL can be used to link to this page
Your browser does not support the video tag.