BUTIER Ryan Weir <br />Construction Managers, Consulting Engineer Contract Administrator <br />room. The project was part of the City of Tustin's Water Services Division, <br />which is responsible for the production and safe delivery of domestic water to <br />more than 14,100 service connections through approximately 172 miles of <br />water mains. Butier staff coordinated with several agencies including the City <br />of Santa Ana and Caltrans. <br />Document Control Specialist; Armstrong Avenue & Warner Avenue <br />Extension Phase 2 Street Improvements; Tustin, CA; City of Tustin <br />(Completion 2015; Value $13.2 million) —The Armstrong Avenue and <br />Warner Avenue Extension Phase 2 project is a part of Tustin Legacy <br />(formerly the Marine Corps Air Station Tustin). Tustin Legacy is an urban <br />master -planned community consisting of over 2,430 homes, "The District" <br />regional shopping center (1 million sq. ft.), various education facilities, <br />neighborhood parks, and major roadways and related infrastructure. The <br />scope of work for this project included roadway improvements, traffic signals, <br />landscape, dry utility, waterline, and reclaimed water and sewer line <br />construction on the following streets: Armstrong Avenue Extension from <br />Warner Avenue to Barranca Parkway and Warner Avenue Extension from <br />Red Hill Avenue to Tustin Ranch Road. <br />Document Control Specialist; Chino Desalter Phase 3 Product Water <br />Pipeline; Ontario, CA; Chino Basin Desalter Authority (Completion: <br />2015; Value: $19 million) —The Product Water Pipeline project is a part of <br />the Chino Desalter Phase 3 Expansion. The scope of work included saw cut, <br />removal and replacement of 10,700 LF of AC paving, temporary paving and <br />base material; installation of 10,700 LF of 30-inch diameter CML&C steel <br />pipe; installation of 905 LF of 42-inch diameter steel casing for connection to <br />existing pump station; connection of existing 30-inch Hamner product water <br />pipeline; pressure testing and disinfection of installation pipeline; installation <br />of 4-inch blow -offs, 30-inch diameter butterfly valves, 4-inch vacuum and air <br />release valves, and manways; potholing of underground utilities; installation <br />of cathodic protection test station; and installation of 30-inch diameter class <br />250 CMUCMC WSP watermain including fittings, thrust blocks and double <br />pass welds. <br />Document Control Specialist; Fletcher Recharge Basin Project; Orange, <br />CA; Orange County Water District (Completion: September 2016; Value: <br />$5.6 million) —The project consisted of re -grading the basin and installing <br />approximately 5,900 linear feet of new 12-inch diameter pipeline. The basin <br />bottom was excavated to expose permeable sand then backfilled to the <br />design grade with imported permeable sand to improve percolation. The PVC <br />pipeline alignment started from south of the Riverview Basin running north <br />along the east side of the Santa Ana River Channel, turning east to Aquarius <br />Place, north on Batavia Street, east on Fletcher Avenue, and ending at <br />Fletcher Basin. The project also included 12-inch diameter welded steel <br />piping; concrete drain structures; a pump station; turnout and meter station; <br />ornamental steel sliding gate and fencing; masonry walls; and access roads. <br />