My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 13 - Approve Amendment to CIP and Appropriation Adjustment, Award Construction Contract
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 13 - Approve Amendment to CIP and Appropriation Adjustment, Award Construction Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:03:25 PM
Creation date
8/22/2023 9:19:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
13
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 2I-6457 <br />VALLEY ADAMS NEIGHBORHOOD WATER MAIN IMPROVEMENTS PHASE 2 <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />PCC Driveway Approach per City Std. <br />Plan1112 <br />225 <br />SF <br />$ <br />15.00 <br />$ <br />3X`0Q <br />15 <br />4" PCC Sidewalk per City Std. Plan <br />1104 <br />150 <br />SF <br />$ <br />$ <br />Ir Op. 00 <br />16 <br />Type "A" Calvert Per City Std. Plan <br />318 <br />1 <br />EA <br />$ <br />(a 170Q. <br />$ r <br />f �Oj 0oo. Oft <br />17 <br />Unclassified Excavation <br />65 <br />CY <br />$ <br />$ <br />P�,oas: o0 <br />18 <br />Asphalt Rubber Hot Mix (ARAM) <br />600 <br />TN <br />$ 4 <br />$ 000.00 <br />19 <br />Asphalt Rubber Aggregate Membrane <br />10600 <br />SY <br />$ <br />$ 01 <br />20 <br />Adjust Manhole Frame and Cover to <br />12 <br />EA <br />$ <br />$ <br />Finished Grade <br />!! i 60 o <br />! ?Jr ROO. 00 <br />*21 <br />potholing (As -Needed) <br />10 <br />EA <br />$ <br />$ <br />75`0.00 <br />22 <br />Striping And Pavement Markings <br />l <br />LS <br />$ <br />$ <br />Pi700. Oc <br />Pi 100.0 0 <br />23 <br />Traffic Control and Traffic Control <br />Plans <br />1 <br />LS <br />$ <br />3,5 000,00 <br />$ ., <br />�t 000. a o <br />24 <br />As-Builts <br />I <br />LS <br />$ <br />I TT 000. <br />$ <br />15 DQ0• 01, <br />P-2 of P-18 <br />iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.