Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 2I-6457 <br />VALLEY ADAMS NEIGHBORHOOD WATER MAIN IMPROVEMENTS PHASE 2 <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />PCC Driveway Approach per City Std. <br />Plan 1112 <br />225 <br />SF <br />$ <br />15-o 0 <br />$ <br />3' 3 7S_- Oo <br />15 <br />4" PCC Sidewalk per City Std. Plan <br />150 <br />SF <br />$ <br />l o.00 <br />$ <br />1 00. 00 <br />1104 <br />16 <br />Type "A" Culvert Per City Std. Plan <br />1 <br />EA <br />j iIDCi. <br />$�/ 000.00 <br />17 <br />Unclassified Excavation <br />65 <br />CY <br />$ <br />$ 257 00 <br />18 <br />Asphalt Rubber Hot Mix (ARHM) <br />600 <br />TN <br />$ <br />oo <br />$ <br />01000.0 <br />19 <br />Asphalt Rubber Aggregate Membrane <br />10600 <br />SY <br />$ <br />$.#0 <br />$ <br />v�96o01 <br />- <br />20 <br />Adjust Manhole Frame and Cover to <br />Finished Grade <br />12 <br />EA <br />$ <br />]1100.0 <br />$ <br />3,a00- 00 <br />*21 <br />Potholing (As -Needed) <br />10 <br />EA <br />$ <br />7 j'a�,1� <br />$ <br />7/5'DO. nd <br />22 <br />Striping And Pavement Markings <br />1 <br />LS <br />$ �p�. <br />��o'jf <br />$ ��4,0 <br />19, <br />23 <br />Traffic Control and Traffic Control <br />Plans <br />1 <br />LS <br />$ <br />35, 00.00 <br />$ -, <br />3 S, a40. V 0 <br />24 <br />As-Builts <br />1 <br />LS <br />$ <br />031000. <br />$ <br />ts,ao6 °$ <br />P' <br />P-2 of P-18 <br />