My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Approve Cooperative Agreement with the City of Irvine
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 17 - Approve Cooperative Agreement with the City of Irvine
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 9:20:33 AM
Creation date
8/22/2023 9:20:28 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
17
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />COOPERATIVE AGREEMENT FOR THE <br />BARRANCA PARKWAY/DYER ROAD/MUIRLANDS BOULEVARD/SEGERSTROM <br />AVENUE/SLATER AVENUE SYNCHRONIZATION PROJECT <br />This Barranca Parkway/Dyer Road/Muirlands Boulevard/Segerstrom <br />Avenue/Slater Avenue Synchronization Project Agreement (“Agreement”) is entered into <br />as of ____________, 2020 (“Effective Date”) by and between the CITY OF IRVINE, a <br />California municipal corporation (“City”), and the CITY OF SANTA ANA, a California <br />municipal corporation and charter city, (“Santa Ana”). City and Santa Ana are sometimes <br />referred to herein individually as a “Party” or collectively as the “Parties”. <br />RECITALS <br />A. City in cooperation with Santa Ana is working to coordinate traffic signals <br />across multiple jurisdictional boundaries as a part of the Renewed Measure M (“M2”) <br />Regional Traffic Signal Synchronization Program Project P (“Project P”) to enhance <br />countywide traffic flow and reduce congestion. <br />B. City has been awarded Project P funds based on the application <br />(“Application”) prepared by City for implementation of signal synchronization of traffic <br />signals along the Barranca Parkway/Dyer Road/Muirlands Boulevard/Segerstrom <br />Avenue/Slater Avenue Corridor between Magnolia Street and Bake Parkway (hereinafter, <br />“Project”). <br />C. Santa Ana has elected to designate City and City agrees to act as <br />implementing agency to carry out the Project. <br />D. The Project will include the synchronization of sixty-six (66) traffic signals <br />as identified in the Application, which is attached and incorporated herein. <br />E. The Project will include elements identified in the Application such as the <br />development and implementation of optimized signal synchronization timing, preparation <br />of before and after study, and installation of signal timing improvements. <br />F. City agrees to work with Santa Ana to coordinate the inclusion of other traffic <br />control elements that must be installed at the same time as the construction of the Project <br />and that are NOT included in the Application. The Parties agree that a Party’s request to <br />include any such element will result in said Party taking full financial responsibility for each <br />and any of those traffic control elements during the cou rse of the Project, unless and <br />otherwise agreed to in writing. <br />G. City agrees to implement the Project as referenced on the Application. <br />H. The Parties agree to contribute the share of the Project as set forth in the <br />Application, which is attached and incorporated herein by reference. Santa Ana’s share <br />shall be a cash contribution equaling Two Hundred Twenty-Two Thousand Four Hundred
The URL can be used to link to this page
Your browser does not support the video tag.