My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Amend Construction Contract with EBS General Engineering Services, Inc.
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 18 - Amend Construction Contract with EBS General Engineering Services, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 9:20:43 AM
Creation date
8/22/2023 9:20:41 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
18
Date
1/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Amend Construction Contract with EBS General Engineering Services, Inc. <br />January 19, 2021 <br />Page 2 <br />2 <br />0 <br />9 <br />On October 6, 2020, the City Council identified and authorized additional funding to <br />expand the project and perform additional sidewalk repairs in other areas of the City. <br />Recent repairs were completed in early December 2020 in the North Windsor Park, <br />Windsor Park, West Grove Valley, Thornton Park, Fairbridge Square and Park Santiago <br />neighborhoods. <br />To capitalize on the favorable pricing of the existing contract with EBS and assist the City <br />in meeting its annual Maintenance of Effort obligation, staff recommends increasing the <br />project contingency by $600,000 to deliver additional sidewalk concrete improvements in <br />the Windsor Village, Artesia Pilar, Pacific Park and Santa Ana Memorial Park <br />neighborhoods (Exhibits 1-2). <br />FISCAL IMPACT <br />Funds are budgeted and available for expenditure as follows: <br />Fiscal <br />Year <br />Accounting <br />Unit-Account # <br />(Project No.) <br />Fund <br />Description <br />Accounting Unit, <br />Account Description Amount <br />ORIGINAL CONSTRUCTION DELIVERY COST <br />FY 2020- <br />21 <br />02917660- <br />62300 <br />(20-6970) <br />Special Gas Tax <br />Roadway <br />Maintenance, Contract <br />Services - Professional <br />$250,470 <br />ADDITIONAL FUNDS – AUTHORIZED OCTOBER 6, 2020 <br />01117626- <br />66220 <br />(20-6970) <br />General Fund <br />Public Works- <br />Sidewalks, <br />Improvements Other <br />Than Building <br />$500,000 <br />FY 2020- <br />21 02917660- <br />62300 <br />(20-6970) <br />Special Gas Tax <br />Roadway <br />Maintenance, Contract <br />Services - Professional <br />$100,000 <br />ADDITIONAL FUNDS – REQUESTED JANUARY 19, 2021 <br />01117626- <br />66220 <br />(20-6970) <br />General Fund <br />Public Works- <br />Sidewalks, Contract <br />Services $500,000 <br />FY 2020- <br />21 <br />02917660- <br />62300 <br />Special Gas Tax <br />Roadway <br />Maintenance, Contract <br />Services - Professional <br />$100,000
The URL can be used to link to this page
Your browser does not support the video tag.