Laserfiche WebLink
Central Pointe Mixed -Use Development Project <br />November 9, 2020 <br />Page 2 of 14 <br />the MEMU EIR was a programmatic EIR, not a project -level EIR. No <br />project -level EIR has been prepared for this Project but one is required; <br />2. the proposed Project is an entirely different project than what was analyzed <br />in the MEMU EIR ("MEMU Project"); <br />3. the proposed Project will have new and different environmental impacts that <br />were not analyzed in the MEMU EIR; <br />4. there is substantial evidence of new information of substantial importance, <br />which was not known and could not have been known with the exercise of <br />reasonable diligence at the time the MEMU EIR was certified as complete <br />showing the Project will have a significant impacts not discussed in the <br />MEMU EIR; <br />5. the City's traffic and hazard and hazardous materials conclusions are not <br />supported by substantial evidence; and <br />6. the MEMU EIR recognized that the MEMU Project would have several <br />significant and unmitigated environmental impacts. As such, a draft EIR is <br />required to analyze and mitigate the impacts of the proposed Project. <br />By opting not to proceed with the required SEIR or TEIR, the City has deprived the <br />members of the public of the public review and circulation requirement available for EIRs. <br />SAFER urges the Commission not to approve the Project, and instead to direct staff to <br />prepare a Draft SEIR or TEIR for the Project, and to circulate the EIR for public review <br />and comment prior to Project approval. <br />I. PROJECT DESCRIPTION <br />The Project involves a residential and commercial development that would consist <br />of two buildings comprised of 644 residential units and 15,130 square feet of commercial <br />space, 1,300 parking spaces and associated amenities and open space. The Project <br />would be located at 1801 East Fourth Street, within the Metro East Mixed -Use Overlay <br />Active Urban zoning district. <br />II. CEQA REQUIRES THE CITY TO PREPARE A TIERED EIR FOR THE <br />PROJECT. <br />CEQA permits agencies to `tier' EIRs, in which general matters and environmental <br />effects are considered in an EIR "prepared for a policy, plan, program or ordinance <br />followed by narrower or site -specific [EIRs] which incorporate by reference the discussion <br />in any prior [EIR] and which concentrate on the environmental effects which (a) are <br />capable of being mitigated, or (b) were not analyzed as significant effects on the <br />environment in the prior [EIR]." (Cal. Pub. Res. Code ("PRC") § 21068.5.) "[T]iering is <br />appropriate when it helps a public agency to focus upon the issues ripe for decision at <br />each level of environmental review and in order to exclude duplicative analysis of <br />environmental effects examined in previous [EIRs]." (PRC § 21093.) The initial general <br />