My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:34:56 PM
Creation date
8/22/2023 9:23:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
1/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Central Pointe Mixed -Use Development Project <br />November 9, 2020 <br />Page 2 of 14 <br />the MEMU EIR was a programmatic EIR, not a project -level EIR. No <br />project -level EIR has been prepared for this Project but one is required; <br />2. the proposed Project is an entirely different project than what was analyzed <br />in the MEMU EIR ("MEMU Project"); <br />3. the proposed Project will have new and different environmental impacts that <br />were not analyzed in the MEMU EIR; <br />4. there is substantial evidence of new information of substantial importance, <br />which was not known and could not have been known with the exercise of <br />reasonable diligence at the time the MEMU EIR was certified as complete <br />showing the Project will have a significant impacts not discussed in the <br />MEMU EIR; <br />5. the City's traffic and hazard and hazardous materials conclusions are not <br />supported by substantial evidence; and <br />6. the MEMU EIR recognized that the MEMU Project would have several <br />significant and unmitigated environmental impacts. As such, a draft EIR is <br />required to analyze and mitigate the impacts of the proposed Project. <br />By opting not to proceed with the required SEIR or TEIR, the City has deprived the <br />members of the public of the public review and circulation requirement available for EIRs. <br />SAFER urges the Commission not to approve the Project, and instead to direct staff to <br />prepare a Draft SEIR or TEIR for the Project, and to circulate the EIR for public review <br />and comment prior to Project approval. <br />I. PROJECT DESCRIPTION <br />The Project involves a residential and commercial development that would consist <br />of two buildings comprised of 644 residential units and 15,130 square feet of commercial <br />space, 1,300 parking spaces and associated amenities and open space. The Project <br />would be located at 1801 East Fourth Street, within the Metro East Mixed -Use Overlay <br />Active Urban zoning district. <br />II. CEQA REQUIRES THE CITY TO PREPARE A TIERED EIR FOR THE <br />PROJECT. <br />CEQA permits agencies to `tier' EIRs, in which general matters and environmental <br />effects are considered in an EIR "prepared for a policy, plan, program or ordinance <br />followed by narrower or site -specific [EIRs] which incorporate by reference the discussion <br />in any prior [EIR] and which concentrate on the environmental effects which (a) are <br />capable of being mitigated, or (b) were not analyzed as significant effects on the <br />environment in the prior [EIR]." (Cal. Pub. Res. Code ("PRC") § 21068.5.) "[T]iering is <br />appropriate when it helps a public agency to focus upon the issues ripe for decision at <br />each level of environmental review and in order to exclude duplicative analysis of <br />environmental effects examined in previous [EIRs]." (PRC § 21093.) The initial general <br />
The URL can be used to link to this page
Your browser does not support the video tag.