My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
01/19/2021 Regular
>
Item 27 - Appeal Application Nos. 2020-03 and 2020-04 - Central Pointe Mixed-Use Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2024 2:34:56 PM
Creation date
8/22/2023 9:23:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Item #
27
Date
1/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
694
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appeal Application Nos <br />January 19, 2021 <br />Page 3 <br />2020-03 and 2020-04 — Central Pointe Mixed -Use Development <br />includes the linear park along the east side of the development, a plaza at the corner of <br />Fourth Street and Cabrillo Park Drive, and internal paseos. The outdoor areas will be <br />programmed with picnic tables, benches, umbrellas, lawn games, decorative hardscape, <br />a pedestrian trail, and landscaping. <br />Vehicular access to the site is provided from both Parkcourt Place and Fourth Street. <br />Onsite parking includes 18 surface level parking spaces off of Fourth Street for the retail <br />spaces and a multi -level parking structure for each residential building. A total of 1,318 <br />parking spaces are proposed which is a ratio of 2.04 spaces per unit. Offsite <br />improvements include a new signalized intersection and crosswalks at Cabrillo Park Drive <br />and Parkcourt Place. The existing median on Parkcourt Place will be reconstructed to <br />provide a 100-foot left turn pocket to allow for vehicles to turn into the site as well as a <br />dedicated left turn lane from Parkcourt Place to northbound Cabrillo Park Drive. The <br />project will construct an additional westbound right -turn lane at Fourth Street onto the <br />northbound 1-5 ramp and a dedicated right -turn lane on Cabrillo Park Drive. In addition, <br />the project will also pay its fair share in modifying the eastbound shared through/right- <br />turn lane to construct a free -right turn lane at the Fourth Street and southbound SR-55 <br />ramp. <br />The building has been designed with contemporary architectural elements comprised of <br />high quality, long lasting materials such as metal siding, stone veneer, simulated wood <br />siding, fiber cement lap siding, fiber cement panels, stucco, metal and glass railings, and <br />aluminum storefronts. <br />Table 2: Project Summary <br />Building A <br />Building B <br />Units <br />325 units <br />319 units <br />Commercial <br />9,568 SF <br />5,562 SF <br />Square <br />Footage SF <br />Building SF <br />286,655 SF <br />274,145 SF <br />Unit Mix/Room <br />19 studios (6%) <br />20 studios (6%) <br />162 one -bedrooms (50%) <br />164 one -bedrooms (51 %) <br />121 two -bedrooms (37%) <br />127 two -bedrooms (40%) <br />23 three -bedrooms 7% <br />8 three -bedrooms 3% <br />Unit SF <br />518 to 543 SF studios <br />518 to 543 SF studios <br />683 to 778 SF one -bedrooms <br />683 to 778 SF one -bedrooms <br />1,066 to 1,148 SF two -bedrooms <br />1,066 to 1,148 SF two- <br />1,274 to 1,339 SF three -bedrooms <br />bedrooms <br />1,274 to 1,339 SF three - <br />bedrooms <br />Height & <br />8-stories, 85'5" <br />8-stories, 85'5" <br />Stories <br />
The URL can be used to link to this page
Your browser does not support the video tag.