CAUTION: IF THIS SHEET IS NOT 24"x36" IT IS A REDUCED PRINT
<br />0
<br />18" RCP SD CONNECTION
<br />TO EXIST. 42" RCP CITY SD
<br />0
<br />rn
<br />EXISTING CATCH BASIN
<br />rn
<br />WESTMINSTER AVENUE
<br />nnnnnc+rn nllNl = nr \A/A\/
<br />CITY GENERAL GRADING NOTES
<br />1. ALL GRADING SHALL COMPLY WITH THE LATEST CBC CHAPTERS 18 AND 33, AND APPENDIX J AND THE SANTA ANA
<br />MUNICIPAL CODE. A CITY GRADING PERMIT IS REQUIRED FOR GRADING.
<br />2. GRADING SHALL NOT BE STARTED WITHOUT FIRST NOTIFYING THE CITY GRADING INSPECTOR. A PRE -GRADING
<br />MEETING ON THE SITE IS REQUIRED BEFORE STARTING OF GRADING WITH THE FOLLOWING PEOPLE PRESENT:
<br />GRADING CONTRACTOR, DESIGN CIVIL ENGINEER, GEOTECHNICAL ENGINEER, GRADING INSPECTOR AND WHEN
<br />REQUIRED, THE ARCHAEOLOGIST AND PALEONTOLOGIST. THE REQUIRED INSPECTIONS FOR GRADING WILL BE
<br />EXPLAINED AT THIS MEETING.
<br />3. AN APPROVED COPY OF THE GRADING PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS.
<br />4. THE DESIGN CIVIL ENGINEER SHALL BE AVAILABLE DURING THE GRADING TO VERIFY COMPLIANCE WITH THE PLANS,
<br />SPECIFICATIONS, CODE AND ANY SPECIAL CONDITIONS OF THE PERMIT WITHIN HIS PURVIEW.
<br />5. THE GEOTECHNICAL ENGINEER SHALL PERFORM PERIODIC INSPECTIONS AND SUBMIT A COMPLETE REPORT AND MAP
<br />UPON COMPLETION OF THE ROUGH GRADING. THE COMPACTION REPORT AND APPROVAL FROM THE GEOTECHNICAL
<br />ENGINEER SHALL INDICATE THE TYPE OF FIELD TESTING PERFORMED. EACH TEST SHALL BE IDENTIFIED WITH THE
<br />METHOD OF OBTAINING THE IN -PLACE DENSITY, WHETHER SAND CONE OR DRIVE RING AND SHALL BE SO NOTED FOR
<br />EACH TEST. SUFFICIENT MAXIMUM DENSITY DETERMINATIONS SHALL BE PERFORMED TO VERIFY THE ACCURACY OF
<br />THE MAXIMUM DENSITY CURVES BY THE FIELD TECHNICIAN.
<br />6. CUT AND FILL SLOPES SHALL BE NO STEEPER THAN 2 FOOT HORIZONTAL TO I FOOT VERTICAL (2:1) EXCEPT WHERE
<br />SPECIFICALLY APPROVED OTHERWISE.
<br />7. FILLS SHALL BE COMPACTED THROUGHOUT TO A MINIMUM OF 90% RELATIVE DENSITY. AGGREGATE BASE FOR
<br />ASPHALTIC AREAS SHALL BE COMPACTED TO MINIMUM OF 95% RELATIVE DENSITY. MAXIMUM DENSITY SHALL BE
<br />DETERMINED BY UNIFORM BUILDING CODE STANDARD NO. 70-1 OR APPROVED EQUIVALENT, AND FIELD DENSITY BY
<br />UNIFORM CODE STANDARD NO. 70-2 OR APPROVED EQUIVALENT.
<br />8. THE CONTRACTOR SHALL NOT CREATE ANY TRENCH OR EXCAVATION 5-FEET OR MORE WITHOUT THE NECESSARY
<br />:AIN PERMIT FROM THE STATE OF CALIFORNIA DIVISION OF INDUSTRIAL SAFETY.
<br />9. ALL CUT SLOPED SHALL BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE GEOTECHNICAL ENGINEER TO
<br />DETERMINE IF ANY SLOPE STABILITY PROBLEM EXISTS. SHOULD EXCAVATION DISCLOSE ANY GEOLOGICAL HAZARDS
<br />OR POTENTIAL GEOLOGICAL HAZARDS, THE GEOTECHNICAL ENGINEER SHALL SUBMIT RECOMMENDED TREATMENT
<br />TO THE CITY ENGINEER FOR APPROVAL.
<br />10. THE PERM ITEE IS RESPONSIBLE FOR DUST CONTROL MEASURES. WATER ACTIVE SITES AT LEAST TWICE DAILY.
<br />11. THE LOCATING AND PROTECTION OF ALL EXISTING UTILITIES IS THE RESPONSIBILITY OF THE PERMITTEE.
<br />12. GRADING OPERATIONS INCLUDING MAINTENANCE OF EQUIPMENT WITHIN ONE-HALF MILE OF HUMAN OCCUPANCY
<br />SHALL NOT BE CONDUCTED BETWEEN THE HOURS OF 5:00 P.M. AND 7:00 A.M.
<br />13. THE PERMITTEE SHALL GIVE REASONABLE NOTICE TO THE OWNER OF ADJOINING LANDS AND BUILDINGS PRIOR TO
<br />BEGINNING EXCAVATIONS WHICH MAY AFFECT THE LATERAL AND SUBJACENT SUPPORT OF THE ADJOINING
<br />PROPERTY.THE NOTICE SHALL STATE THE INTENDED DEPTH OF EXCAVATION AND WHEN EXCAVATION
<br />COMMENCES. THE ADJOINING OWNER SHALL BE ALLOWED AT LEAST 30 DAYS AND REASONABLE ACCESS ON THE
<br />PERMITTED PROPERTY TO PROTECT HIS STRUCTURE, IF HE SO DESIRES, UNLESS OTHERWISE PROTECTED BY LAW.
<br />14. ALL EXISTING DRAINAGE COURSES THROUGH THE SITE SHALL REMAIN OPEN TO HANDLE THE STORM WATER;
<br />HOWEVER, IN ANY CASE, THE PERMITTEE SHALL BE HELD LIABLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL
<br />DRAINAGE PATTERNS.
<br />15. APPROVED EROSION PROTECTION DEVICES SHALL BE PROVIDED AND MAINTAINED DURING THE RAINY SEASON AND
<br />SHALL BE IN PLACE AT THE END OF EACH DAY'S WORK. PROPER EROSION CONTROL MEASURES MUST BE SHOWN ON
<br />THE PLANS.
<br />16. CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN ANTICIPATED STORM DOES NOT CARRY
<br />WASTES OR POLLUTANTS OFF THE SITES.
<br />RAIN DISCHARGES OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY WHEN NECESSARY FOR PERFORMANCE
<br />AND COMPLETION OF CONSTRUCTION PRACTICES AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION
<br />OF ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR
<br />CONTAIN A HAZARDOUS SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR 117 AND
<br />302.
<br />__F
<br />POTENTIAL POLLUTANTS INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM
<br />PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS;
<br />ASBESTOS FIBERS, PAINT FLAKES OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC RADIATOR OR
<br />BATTERY FLUIDS; FERTILIZERS, VEHICLES/EQUIPMENT WASH WATER AND CONCRETE WASH WATER; CONCRETE,
<br />DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM CLEANING OR CHEMICAL
<br />DEGREASING; AND SUPERCH LORINATED POTABLE WATER LINE FLUSHINGS.
<br />DURING CONSTRUCTION, DISPOSAL OF SUCH MATERIALS SHOULD OCCUR IN A SPECIFIED AND CONTROLLED
<br />TEMPORARY AREA ON -SITE, PHYSICALLY SEPARATED FROM POTENTIAL STORM WATER RUN-OFF, WITH ULTIMATE
<br />DISPOSAL IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL REQUIREMENTS.
<br />17. DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS
<br />PROHIBITED. DEWATERING OF NON -CONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE
<br />ELIMINATION SYSTEM PERMIT FROM THE RESPECTIVE STATE REGIONAL WATER QUALITY CONTROL BOARD.
<br />18. ALL DIRT, SAND, MUD, OR DEBRIS DEPOSITED OR SPILLED UPON PUBLIC STREETS DURING ANY GRADING, HAULING,
<br />OR EXPORT OPERATIONS SHALL BE IMMEDIATELY CLEANED UP BY THE DEVELOPER, HIS CONTRACTOR,
<br />SUBCONTRACTORS, OR AGENTS TO THE SATISFACTION OF THE CITY ENGINEER. FAILURE TO DO SO WILL BE CAUSE
<br />FOR STOPPING ALL SUCH GRADING, HAULING, OR EXPORT WORK BY THE CITY UNTIL SUCH TIME AS THE STREETS ARE
<br />CLEANED.
<br />19. ALL TRUCKS HAULING DIRT, SAND, OIL, OR OTHER LOOSE MATERIALS ARE TO BE COVERED OR SHOULD MAINTAIN A
<br />LEAST TWO FEET OF FREEBOARD IN ACCORDANCE WITH THE REQUIREMENTS OF CVC SECTION 23114.
<br />20. CONTRACTOR IS RESPONSIBLE FOR THE REPAIR OF ALL DAMAGES TO PUBLIC PROPERTIES THAT ARE CAUSED BY THE
<br />WORK ON -SITE. REPAIR MUST BE COMPLETED TO THE SATISFACTION OF THE CITY ENGINEER.
<br />21. PRELIMINARY EARTHWORKS:
<br />CUT 365 CUBIC YARDS
<br />FILL 2025 CUBIC YARDS
<br />NET 1660 CUBIC YARDS (FILL)
<br />SUBMIT HAUL ROUTES FOR APPROVAL IF NET VOLUMES EXCEED 500 CUBIC YARDS.
<br />22. SEPARATE PERMITS MUST BE OBTAINED MOM THE CITY BUILDING AND SAFETY DIVISION FOR THE CONSTRUCTION OF
<br />RETAINING WALLS, LIGHT POLES, TRASH ENCLOSURES, ON -SITE PLUMBING AND ALL BUILDING STRUCTURES.
<br />LEGEND:
<br />— — PROPERTY LINE
<br />BW
<br />BACK OF WALK
<br />FF
<br />FINISHED FLOOR
<br />— CENTERLINE
<br />FL
<br />FLOW LINE
<br />EXISTING 1' CONTOUR
<br />FS
<br />FINISHED SURFACE
<br />GB
<br />GRADE BREAK
<br />— PROPOSED FLOW LINE
<br />LP
<br />LOW POINT
<br />PA
<br />PLANTER AREA
<br />(XX.XX) EXISTING JOIN SPOT ELEVATION
<br />R
<br />RIDGE
<br />XX.xX PROPOSED SPOT ELEVATION
<br />SD
<br />STORM DRAIN
<br />TC
<br />TOP OF CURB
<br />X.x� PROPOSED SLOPE AND
<br />DIRECTION
<br />TG
<br />TOP OF GRATE
<br />PROPOSED STORM LINE
<br />RIDGE / GRADE BREAK
<br />0 10 20 40
<br />SCALE: 1" = 20'
<br />W z
<br />0
<br />w
<br />0
<br />CD
<br />z
<br />0
<br />Q
<br />w
<br />E
<br />0
<br />CO pp U
<br />M M 0
<br />E m o CO U
<br />a) E -0 o� E
<br />0 c 0
<br />M�
<br />FOR AND ON BEHALF
<br />OF WARE MALCOMB
<br />U)
<br />O
<br />N
<br />z
<br />0)
<br />~/
<br />LL
<br />U
<br />Q
<br />Q
<br />Z
<br />z
<br />Lu
<br />Q
<br />G
<br />U)
<br />Lu
<br />O
<br />Q
<br />L U
<br />Lu
<br />Lu
<br />z
<br />0
<br />Cn
<br />Lu
<br />z
<br />�
<br />Cy)
<br />N
<br />C�
<br />O
<br />Lo
<br />U
<br />`\'
<br />JOB NO.:
<br />IRV20-4009
<br />PA / PM:
<br />LC
<br />DRAWN BY:
<br />AN
<br />DATE:
<br />11 /04/2020
<br />PLOT DATE:
<br />0
<br />F
<br />SHEET
<br />■2 of 8