Laserfiche WebLink
Prior to the issuance of a grading permit, the property <br />Verify project has <br />Prior to Issuance of any <br />Oncefor <br />City of Santa <br />owner/developer shall retain a qualified archeologist <br />retained q ualifad <br />grading permits <br />archaeologist <br />Ana Planning <br />meetingthe Secretary ofthe Interiors Professional <br />archeologist to be <br />retention <br />and Building <br />Qualification Standards for archaeology(National Park <br />present during all initial <br />At the commencement <br />Agency <br />Service 1983) to be presamduring all Initial subsurface <br />subsurface ground- <br />of ground-dlsturbing <br />Continuous <br />ground -disturbing constructlon activities. At the <br />disturbing construction <br />activltles, thereafter, <br />throughout <br />commencement of construction activities, an orientation <br />activities - <br />every eight weeks unless <br />grading and <br />meeting shall be conducted by the qualified archeologist, <br />t tI I b <br />there are no new <br />ground <br />cons ruc on manager, genera contractor, in contractor, <br />and construction workers associated with ground- <br />Verify completion of <br />construction personnel disturbing <br />disturbing activities. The orientation meeting shall <br />orientation meeting at <br />activities <br />describe the potential ofeaposing archeological <br />commencement of <br />resources, the types of resources that may be <br />construction activities <br />encountered, and directions on the steps that shall be <br />and review <br />taken if such a find is encountered. <br />documentation <br />demonstrating worker <br />attendance <br />CR 2 Unanticipated Discovery of Archeological Resources <br />If archeological resources are encountered during <br />Field verify ground- <br />On an as -needed basis if Once for City of Santa <br />ground -disturbing activities, the construction manager <br />disturbing construction <br />archaeological resources ceased Ana Planning <br />shall Immediately halt all work activities within 100 feet <br />activities have ceased, <br />arefound construction and Building <br />of the discovery and a qualified archeologist meetingthe <br />if ammeologlcal <br />activities Agency <br />Secrete ry of the l marlors Professional Qualification <br />resources are fou no <br />Standards for archeology (National Park Service 19831 <br />As needed far <br />shall immediately evaluate the find. After cessation of <br />Cwith qualified <br />consultation <br />coologist <br />ground -disturbing activities, the construction manager <br />archaeologist for <br />efforts <br />shall immediately contact the Cltys Planning and Building <br />appropriate treatment <br />- <br />Agency. Work shall not resume until authorized by the <br />of find <br />Director/Manager (or his/her designee(, and the qualified <br />archeologist. <br />If the qualified archeologist determines that the <br />Consult with Native <br />discovery constitutes a significant resource under CECA, <br />American <br />preservation In place Is the preferred manner of <br />representatives for <br />mitigatIon, In the event preservation in place is <br />appropriate treatment <br />demonstrated infeasible, and data recovery is <br />of find, as needed <br />determined to be the only feasible mitigation option, a <br />detailed Cultural Resources Treatment Plan shall be <br />prepared and Implemented by a qualified archeologist in <br />Resolution No. 2021-xx <br />Page 8 of 14 <br />