Laserfiche WebLink
Prior to the Issuance of any permits for Initial site clearing <br />Verify project has Prior to the Issuance of once each for City of Santa <br />(such as pavement removal, grubbing, tree removals( or <br />retained qualified Initial site clearing monitor Ana Planning <br />Issuance of permits allowingground-disturbingactivitles <br />Native American permits or ground- retention a no and Building <br />that cause excavation to depths greater than artificial flll <br />Moot disturbing activity contract Agency <br />(including boring,grading, excavation, drilling, potholing <br />permits review <br />or auguring, and trenching), the City of Santa Ana shall <br />Revlewan verify <br />ensure that the project applicant/developer retains <br />executed contract <br />qualified Native American Monitorial with ancestral ties <br />to the project area and approved by the tribe(,) that <br />consulted on this project pursuant to AB 52 (the <br />'Tribe(,)" or "Consulting Tribe(s)' ), A copy of the <br />executed contract shall be submitted to the City of Santa <br />Ana Planning and Building Department. The Monitorial <br />will only be present on -site during Initial site clearing and <br />construction that Involves ground disturbing activities. <br />Ground -disturbing activities are defined as activities that <br />may Include, but are not limited to, pavement removal, <br />potholing or auguring, grubbing, tree removals, boring, <br />grading, excavation, drilling, and trenching, within the <br />projectarea. The Monitor(s) will complete daily <br />monitoring logs that will provide descriptions of the day's <br />activities, Including construction activities, locations, soil, <br />and any cultural materials Identified. The on -site <br />monitoring shall end when all ground disturbing activities <br />on the project site are completed, or when the <br />archeologist and Native American Moultor(s) have <br />indicated that all upcoming ground -disturbing activities at <br />the project site have little to no potential for Impacting <br />_ <br />tribal cultural resources. <br />TCR2 Unanticipated Discovery of Tribal Cultural Resources: <br />In the event that tribal cultural resources a re <br />Field verify ground- <br />On an as -needed basis if Once for <br />City of Santa <br />inadvertently discovered it uring ground -disturbing <br />it lsturang construction <br />cultural resources are ceased <br />Ana Planning <br />activities, construction activities shall cease In the <br />activities have ceased, <br />found construction <br />and Building <br />Immediate vicinityofthe find (not less than the <br />ifcultuml resources are <br />activities <br />Agency <br />surrounding feet) until thefind can be assessed bythe <br />found <br />qualified archeologist and Native American Monitor(,) <br />approved bytheconsulting Tribe(s). If the resources are <br />Consult with Native <br />As needed for <br />consultation <br />- <br />Native American in origin, the Consulting Tribe(,) will <br />American <br />efforts <br />retain It/them in the form and/or manner the Tribe <br />Resolution No. 2021-x <br />Page 13 of 14 <br />