My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BEST DRILLING AND PUMP, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
BEST DRILLING AND PUMP, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2023 4:50:55 PM
Creation date
8/24/2023 4:39:19 PM
Metadata
Fields
Template:
Contracts
Company Name
BEST DRILLING AND PUMP, INC.
Contract #
P-19-6423
Agency
Public Works
Council Approval Date
6/20/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 19-6423 <br />WASHINGTON WELL IMPROVEMENTS <br />WELL DRILLING (PHASE 1) RE -DID <br />Item <br />9C <br />Des Mon <br />18-inch ED Louvered Well Casing <br />600 <br />+422FT <br />Unit <br />�ult <br />FT <br />Unit Price <br />$ 686.00 <br />Amount <br />411,600.00 <br />9D <br />3-inch Dia. Gravel Feed Tube <br />$ 79.00 <br />$ 33,338.00 <br />9r <br />2-inch Dia. Pressure Transducer <br />Tube <br />452 <br />FT <br />$ 65.00 <br />$ 29,380.00 <br />90 <br />4-inob Dia, Camera Tube <br />440 <br />FT <br />$ 160.00 <br />$ 70,400,00 <br />9H <br />3-inch ID Air Vent Tube <br />4 <br />FT ~ <br />$ 200.00 <br />$ 800.00 <br />10A <br />Pilot Hole Bottom Bentortite Sea] <br />10 <br />FT <br />$ 55.00 <br />$ 550.00 <br />(Optional) <br />10B <br />rntm-Annular Seal (Optional) <br />20 <br />FT <br />$ 55-00 <br />1,100.00 <br />Gravel Pack <br />890 <br />FT <br />$ 100.00 <br />$ 89,000.00 <br />12 <br />Annular Grout Seal <br />395 <br />FT <br />$ 130.00 <br />$ 51,350.00 <br />13 <br />Well Casing Alignment Testing <br />t <br />LS <br />5,000,00 <br />$ 5,000.00 <br />14 <br />Standby Time <br />24 <br />HR <br />$ 400.00 <br />%600.00 <br />L5 <br />Mechanical Well Development <br />^ 120 <br />HR <br />$ 800.00 <br />$ 96,000.00 <br />16A <br />Chemical Development (12.5% <br />257 <br />GAL <br />30.00 <br />$ 7,710.00 <br />Chlorine Solution) <br />16D <br />Chemical Development (Polymer <br />32 <br />GAL <br />200.00 <br />$ 6,400.00 <br />Dispersant) <br />17 <br />Color Video Surveys <br />3 <br />EA <br />rv� <br />$ 2,000,00 <br />$ 6,000.00 <br />18A <br />Temporary Test Pump <br />t <br />LS <br />$ 30,000.00 <br />$ 30,000,00 <br />18B <br />Flow Meter Device <br />1 <br />LS <br />5,000,00 <br />$ 5,000.00 <br />18C <br />Water Quality Meter <br />I <br />LS <br />15,000-00 <br />15,006.00 <br />19 <br />- — ------------ - <br />Pumping Development <br />60 <br />HR <br />$ 600,00 <br />$ 36,000,00 <br />P-2 of P-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.