My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARAKELIAN ENTERPIRCES, INC. DBA ATHENS SERVICES
Clerk
>
Contracts / Agreements
>
A
>
ARAKELIAN ENTERPIRCES, INC. DBA ATHENS SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 1:52:46 PM
Creation date
9/13/2023 5:07:42 PM
Metadata
Fields
Template:
Contracts
Company Name
ARAKELIAN ENTERPIRCES, INC. DBA ATHENS SERVICES
Contract #
A-2023-154
Agency
Public Works
Council Approval Date
8/29/2023
Expiration Date
6/30/2024
Insurance Exp Date
3/1/2024
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />the sweeping path by the operator rather than going around them. Immovable items that <br />impede sweeping such as construction debris and areas of impaired vertical or horizontal <br />clearance caused by tree limbs shall be reported to the Project Manager or designee <br />immediately for correction. <br />3. Contractor is not responsible for areas missed due to parked cars or other personal <br />property. <br />4. Standards, schedules, and frequencies may be modified from time to time as deemed <br />necessary by the City to ensure the Contractor's conformance with the standard of care <br />specified in in Section 3.2.7 of the Agreement. <br />5. Due to different street widths throughout the City, street sweeping may require slower travel <br />speed and/or multiple passes by the sweeper, in many cases, to ensure curb -to -curb <br />coverage of the street. <br />6. Streets with raised medians (commercial and residential) shall have their curb -gutter <br />perimeter swept, including turnouts. <br />7. Street grade striped medians shall be swept in their entirety. <br />8. All deposits within intersections shall be removed as part of the sweeping operations. <br />9. Each street shall be swept clean to the adjacent property line. If a swept area is deemed <br />by the Project Manager or designee as failing to conform to the standard of care specified <br />in in Section 3.2.7 of the Agreement, the substandard section shall be re -swept before the <br />end of the day at no charge to the City. <br />The determination of acceptable performance in accordance with standard of care specified in <br />in Section 3.2.7 of the Agreement is at the sole, reasonable discretion of the City. Contractor <br />shall re -sweep at their own expense. The Project Manager or designee shall be notified of the <br />completed re -sweep. Swept clean means clean street with debris trails left behind. Any <br />sweeper used must not blow debris onto private property. <br />VI. GLOBAL POSITIONING SYSTEM (GPS) <br />1. The Contractor shall provide automatic vehicle location device (vehicle location and <br />management system [e.g., GPS]) on all street sweeper units, including subcontractors. <br />This device shall be placed on all sweeping equipment assigned to the City at the <br />Contractor's cost. <br />2. Contractor shall provide associated easy to use, cloud based software programs, which <br />will report all street sweeping activity and is accessible from web browsers on a variety <br />of desktop, laptop and mobile devices. The associated software shall be provided at no <br />cost to the City including monthly monitoring charges. The Contractor shall provide <br />software and licensing for a minimum of five (5) City users. <br />3. Software shall be capable of demonstrating real-time location, speed and path of travel of <br />equipment equipped with GPS systems. Software shall be capable of recording and <br />printing daily activity logs indicating actual miles traveled, streets swept, curb miles swept, <br />brooms up or down, the direction and speed of travel, ground speed of equipment, the <br />location of equipment at any given time and any other information that is suitable for <br />documenting actual work performed by the Contractor under this agreement. <br />4. Contractor shall have a tachograph system to backup GPS in the event of a system failure <br />and shall submit an initialed tachograph chart for any period of work with the monthly <br />invoice for any day of work that the GPS system is non -operational. <br />5. Contractor shall provide adequate training on an annual basis for City staff in the operation <br />and use of this system and allow City of Santa Ana Public Works Maintenance division <br />
The URL can be used to link to this page
Your browser does not support the video tag.