Laserfiche WebLink
• Installation of chemical dosing stations <br />• Inspection and repairs of pipelines ranging in size from 6 inch up to 120 inch <br />• Short term and long tern bypass pumping with CK pumps <br />• Repairs to steam lines <br />• Installation of hot taps and saddles on live lines <br />• Grinder installation, removal, replacement, and rebuilds <br />3. Electrical Systems <br />• Installation of flow meters <br />• Installation of new pumps <br />• Installation of control panels <br />• Installation of power panels <br />• Installation of backup generators <br />4. Instrumentation Systems <br />• Installation of VFD's <br />• Installation of control panels <br />• Installation of meters <br />• Installation of flow meter and control components <br />5. Structural Repairs and Replacements <br />• Bulkhead and vault inspection, modifications and repairs J-110, J-112, J-117, P2-98, P1-105, and <br />P2-122 <br />• Building demo <br />• Window and door retrofitting and installation <br />5 1 P a g e <br />