My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-09-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
09/19/2023 Regular
>
Agenda Packet_2023-09-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2023 3:47:31 PM
Creation date
9/18/2023 8:22:09 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
9/19/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
843
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Resources Functional Specifications Development and Scada Programming Services 17 <br />the existing source control database from the approximate 45 PLC devices located throughout the City. <br />Our goal is to develop and document rules, standards and procedures for database structure and <br />program check -in and check-out processes. <br />SCADA Change control consists of the proposed installation, management and maintenance of a <br />robust change control system, and establishment of processes to regulate and organize proposed <br />SCADA system and site local control programming updates and related integrator operations. The <br />objective of the SCADA Change Control services is to prevent ad -hoc SCADA configuration changes <br />and ad -hoc PLC programming changes, to properly document new instrumentation additions, and to <br />ensure that proper documentation is maintained regarding the nature and reason for the desired <br />system changes, as approved by the city. <br />Project Management will Organize and direct a kickoff meeting (Project Execution Plan) to examine the <br />project's scope, methodology, and current system. The Consultant should present a first timetable with <br />key milestones during the meeting (Schedule). Compile and submit meeting minutes to the City within <br />five business days of the meeting (Communication Procedures). Send monthly schedule of values <br />reports (Budget & Work Breakdown Structure) and complement with frequent telephone conversations <br />(Staffing Plan) to review the status of ongoing work initiatives and lingering concerns, as necessary <br />(Quality Management Plan). <br />Project Owner City of Upland, Department of Public Works California <br />Project Name PLC/SCADA City of Upland Water System (Entire City) <br />Address 1379 N Bensen Ave. Upland, CA 91786 <br />Contact John Robles) (909) 931-4100 1 jrobles@ci.upland.ca.us <br />Field Instrumentation <br />(35) Sites: <br />Provided/Completed <br />Magnetic Flowmeters <br />Analytical Instruments <br />Submersible Level Sensors <br />Miscellaneous Equipment <br />PLC Control Panels: <br />SCADA System: <br />(1) Main Master PLC <br />(4) Workstation Computer <br />(Redundant System) <br />Systems with Wonderware <br />(35) Sites: Well PLC, <br />SCADA Server. <br />Reservoir PLC, Treatment <br />- Tag logging database <br />Type of Equipment <br />Plant PLC Panels & PRV's <br />- Printers & Alarm Printers <br />Furnished <br />PLC Components: <br />- Radio System with Redundant units. <br />NEMA 4 Enclosures <br />- Modem with leased phone line <br />Allen Bradley ControlLogix- <br />-Winn911 Alarm System with <br />1756-LX Processor <br />configurable schedule <br />Redundancy Module <br />- Report System with Excel output <br />1/0 Modules, Power Supply <br />format <br />Ethernet Switch <br />Project Budget <br />$1,300,000.00 <br />Project Initiation/Complete <br />Year 2007 / Yearly Sole Source Maintenance Supplier <br />2nd Project Reference: <br />Project Owner <br />City of Oceanside Development Services Department <br />Project Name <br />Advanced Water Purification Facility <br />Project <br />Address <br />3950 N River Rd San Luis Ray Water Reclamation Facility Oceanside, <br />CA 92058 <br />Contact <br />Rob Williams) (949) 398-6070 <br />1 rwilliams@shimmick.com <br />Field Instrumentation <br />(35) Magnetic Flowmeters <br />(1) Conductivity Analyzer <br />provided: <br />(17) Level Transmitters <br />(3) Turbidity Analyzers <br />(5) Pressure Transmitters <br />(5) Total Chlorine Analyzers <br />SOffACity Council <br />17 — 239 <br />9/19/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.