Laserfiche WebLink
SETUP IN THE MIUULE (INITIAL DIN <br />SETUP). <br />2. TRUCK TO BACK UP WITH EMPTY BIN. <br />3. TRUCK TO PULL FORWARD WTH <br />EMPTY BIN AND PLACE. <br />4. TRUCK TO BACK UP AND POSITION <br />ITSELF TO PULL FORWARD. <br />5. TRUCKTO PULL FORWARD AND <br />REPEAT PATTERN UNTIL ALL BINS ARE <br />SERVICED. <br />SEE PAGE TOA FOR EXACT DIN MOVEMENT <br />PATTERN. <br />FRONT LOAD VEHICLE ENTRY INITIAL DIN PLACEMENT <br />AMERICAN P °m <br />TRASH MANAGEMENT <br />CENTRAL POINTE SCHEMATIC DESIGN <br />8 TA MA. CA !2019A M JULY 30TH. 202D <br />ITSELF FOR 3 POINT TURN. <br />7-9_ TRUCK TO CONDUCT 3 POINT TURN <br />10, TRUCK TO PULL FORWARD AND EXIT <br />SEE PAGE TOA FOR EXACT BIN MOVEMENT <br />PATTERN. <br />FRONT LOAD VEHICLE EXIT (POST -PICKUP BIN PLACEMENTS <br />OQ� <br />35H SPU Flant End Loader <br />Overall Len <br />Overall Wdaamm <br />35.0 OR <br />10,tft <br />MSn Body GroHntl Clearance <br />Max T—k Witllh <br />l 37in <br />8.00of <br />Lack-ta-iackhms <br />fi.04s <br />Empty Weight <br />Gloss Weight <br />]S,R401bs <br />Is cob <br />service Clearance <br />24g <br />hl—VItteal base <br />55.33R <br />O o I TRASH STAGING & TRUCK MANUVERING <br />EVELI —CAL <br />T-0.3 <br />City Council 21 — 76 9/19/2023 <br />