Laserfiche WebLink
PFAS Impacts at OCWD <br />$1 B COST <br />—$285M treatment system <br />capital cost, —$15M O&M (over <br />30 years), interim replacement <br />water (costs likely to increase) <br />"" "TAI' Ere - <br />impacted (cities and water districts) <br />100% <br />design and construction <br />funded by OCWD <br />n <br />need treatment <br />(possibly more in future) <br />It 4s� <br />38 SYSTEMS <br />need to be built to remove PFAS <br />from local well water <br />f ; 0 O/P <br />ongoing O&M costs <br />funded by OCWD <br />