Laserfiche WebLink
I Well Locatic <br />, t , <br />T <br />I. A- Well 35 <br />Planning Study <br />Costs: —$5.5 Mill <br />tl <br />ell 21 <br />We:11 *20 <br />elll-� <br />Winterburg lChannef (C j05 <br />C06 P05 <br />A-, <br />0XIJL P.,kr <br />ki— M a Gat <br />n tie <br />4L IF Ogg <br />Well 38 <br />Well 32 A ell 28 <br />Commencing Construction <br />Well 2 <br />Costs: $7 Mill <br />WELL!38. <br />Well <br />ell 18, 7 <br />W E L L-2 <br />10ell 39 Well 27 & 28 (Crooke Station) <br />Planned for Bidding <br />A <br />ELL 35 <br />Costs: —$13.0 Mill <br />UPPER ZONE <br />Well 40 <br />Well 40 <br />Completed Construction <br />Well 140114 <br />Costs: $5.5 Mill <br />LOWER ZONE <br />Well 29 <br />WUII-33 .......... / <br />ell 311 <br />, <br />W <br />61 W <br />_,,wei 137 ell 31 <br />Planned for Bidding <br />L <br />Costs: Approx. —$6.5 Mill <br />Santa Ana Garden Channel (F02) <br />q—, Well 26 <br />P.k LEGEND <br />Well 26 <br />AL Impacted Wells <br />Planning Study <br />Costs: <br />t Non -Detect Wells <br />ostsos s 0 <br />: —$5.5 Mill <br />Preenvifle Elan ingphaMef (D03) <br />YVell 34 <br />II <br />I- Rd <br />Lane Channel (FOB) <br />0 Operating Wells <br />Ej OCWD Funded <br />Ej City Funded <br />