My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ASCENT ENVIRONMENTAL (2)
Clerk
>
Contracts / Agreements
>
A
>
ASCENT ENVIRONMENTAL (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2024 2:37:03 PM
Creation date
9/26/2023 10:58:08 AM
Metadata
Fields
Template:
Contracts
Company Name
ASCENT ENVIRONMENTAL
Contract #
A-2020-241-02A
Agency
Planning & Building
Council Approval Date
12/1/2020
Expiration Date
11/30/2024
Insurance Exp Date
3/15/2025
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESTIMATED COST <br />Ascent proposes to complete the scope of work identified above for an estimated not -to -exceed fee of <br />$109,035. A summary by task is provided below with additional line -item detail and labor hours in the <br />attached spreadsheet (Attachment A). <br />TASK <br />Task 1. Project Initiation/Kickoff <br />ESTIMATED FEE <br />$3,870 <br />Task 2. Peer Review of Applicant -Prepared Initial Study, Draft EIR and Technical <br />Studies <br />$49,495 <br />Task 3. Peer Review of Final EIR <br />$17,640 <br />Task 4. Project Management and Meetings <br />$25,340 <br />Direct Expenses (including subconsultant fees) <br />$12,690 <br />Total <br />$109,035 <br />Cost Assumptions <br />The proposed estimated price is presented above. To promote clarity, the following assumptions explain <br />the basis of the proposed price. The price is estimated based on a good -faith, current understanding of <br />the project. If selected, Ascent is interested in discussing the City's needs and revising the scope of work <br />and price, as warranted, to meet expectations. <br />• Proposed Price Validity. The price proposed to carry out the scope of work is valid for 120 days <br />from the date of submittal, after which it may be subject to revision. <br />• Time -and -Materials Cost. The proposal is a not -to -exceed price to perform the proposed scope of <br />work. Monthly invoices will be submitted based on a time -and -materials basis occurring in each <br />billing period. <br />• Price and Staff Allocation to Tasks. Labor and other direct costs have been allocated to tasks to <br />determine the total budget. Ascent may reallocate costs and labor resources, as needed, as long <br />as the total contract price is not exceeded. <br />• Meetings and Conference Calls. The number and duration of proposed meetings and conference <br />calls are specified. If they are exceeded, a budget augmentation may be warranted. <br />• Scope of Analysis. The price is based on the proposed scope of analysis. If new technical issues, <br />alternatives, field surveys, modeling, or analysis is identified after contract execution, a budget <br />amendment may be warranted. <br />• Review of Modeling Outputs. Ascent will conduct a cursory review of modeling appendices for <br />consistency (if provided); however, this scope does not include detailed review or investigations <br />into the modeling software or outputs. <br />• Responses to Comments. It is difficult to predict the number and magnitude of comments <br />received on the Draft EIR; however, we have assumed a budget of up to 40 hours to peer review <br />responses to comments. Once all Final EIR files are received, we will provide an estimate on the <br />level of effort required to complete the peer review of responses to comments. Any discrepancies <br />with the original budget will be discussed with the City and may require a budget augment. <br />CITY OF SANTA ANA II CEOA SERVICES FOR THE VILLAGE SANTA ANA SPECIFIC PLAN 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.