Laserfiche WebLink
Cabrillo Town Center Project <br />City of Santa Ana <br />October 2, 2023 <br />Page 2 of 6 <br />PROJECT DESCRIPTION <br />The Project proposes to demolish four commercial office buildings and construct a five - <br />story mixed -use building that includes 449 residential units, a 898-stall parking garage, 6,000 <br />square feet of retail space, and 9,000 square feet of live/work area. The Project also includes the <br />development of a 58-unit townhome community with six three-story buildings and an additional <br />127 parking spaces. <br />LEGAL STANDARD <br />The 2007 EIR and 2018 SEIR serve as a program EIR for the Metro East Mixed Use <br />Overlay Zone. For program EIRs, "later activities in the program must be examined in the light <br />of the program EIR to determine whether an additional environmental document must be <br />prepared." (14 CCR § 15168(c).) A program EIR may only serve "to the extent that it <br />contemplates and adequately analyzes the potential environmental impacts of the project." <br />(Sierra Nevada Conservation v. County of El Dorado (2012) 202 Cal.App.4th 1156, 1171 <br />[quoting Citizens for Responsible Equitable Envtl. Dev. v. City of San Diego Redevelopment <br />Agency (2005) 134 Cal.App.4th 598, 615].) No new environmental document for a project is <br />required if the project is "within the scope" of the program EIR. (14 CCR § 15168(c)(2).) <br />Whether a project is "within the scope" of the program EIR is determined by whether a <br />subsequent EIR is required under Guidelines section 15162. (Id.) <br />Pursuant to Guidelines sections 15162(a) and 15168(c), a project is not within the scope <br />of a previous program EIR where: <br />(1) Substantial changes are proposed in the project which will require major revisions of <br />the previous EIR or negative declaration due to the involvement of new significant <br />environmental effects or a substantial increase in the severity of previously identified <br />significant effects; <br />(2) Substantial changes occur with respect to the circumstances under which the project <br />is undertaken which will require major revisions of the previous EIR or Negative <br />Declaration due to the involvement of new significant environmental effects or a <br />substantial increase in the severity of previously identified significant effects; or <br />(3) New information of substantial importance, which was not known and could not <br />have been known with the exercise of reasonable diligence at the time the previous <br />EIR was certified as complete or the negative declaration was adopted, shows any of <br />the following: <br />(A) The project will have one or more significant effects not discussed in the <br />previous EIR or negative declaration; <br />(B) Significant effects previously examined will be substantially more severe <br />than shown in the previous EIR; <br />(C) Mitigation measures or alternatives previously found not to be feasible <br />would, in fact, be feasible and would substantially reduce one or more <br />