My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PONCE, ENRIQUE
Clerk
>
Contracts / Agreements
>
P
>
PONCE, ENRIQUE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2023 4:57:55 PM
Creation date
10/2/2023 4:56:14 PM
Metadata
Fields
Template:
Contracts
Company Name
PONCE, ENRIQUE
Contract #
N-2023-246
Agency
Public Works
Expiration Date
9/1/2024
Insurance Exp Date
1/1/1990
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Compliance with Laws. Licensee shall cause all activities of Licensee under this <br />Agreement and all activities on the License Area to be performed in compliance with all applicable federal, <br />state, and local laws, ordinances, and regulations, and permits. <br />4. Best Management Practices and Clean Up. At its sole cost, Licensee shall clean up and <br />install, implement, and maintain Best Management Practices (BMPs) at the License Area as outlined below. <br />Within seven (7) days of occupying the License Area, the Licensee shall: <br />(a) Remove old and/or damaged sediment control BMPs from the License Area and install <br />new sediment control BMPs along the entire perimeter of the License Area. <br />Appropriate sediment control BMPs include straw wattle, gravel bag berm, or silt <br />fence. Licensee shall install sediment control BMPs per the SE-5, SE-6, or SE-1 details <br />provided in the California Stormwater Quality Association (CASQA) Stormwater <br />BMP Handbook for Construction. <br />(b) Install tracking control BMPs at the vehicle access point to the License Area. Licensee <br />shall install tracking control BMPs per the TC-1 detail provided in the California <br />Stormwater Quality Association (CASQA) Stormwater BMP Handbook for <br />Construction. <br />(c) Install a fence, if required, and Green Screen. <br />Throughout the duration of the License Agreement, the Licensee shall: <br />a) Cover all stockpiles that are not actively being used or scheduled to be used within a <br />seven (7) day period. Additionally, all stockpiles shall be covered prior to the onset <br />of precipitation. Licensee shall ensure that stockpile coverings are installed securely <br />to protect from wind and rain. Licensee shall only be allowed to stockpile <br />construction materials or sediment that is directly related to their City of Santa Ana <br />Capital Improvement Project. <br />b) Maintain effective Tracking control BMPs to prevent off -site sediment tracking from <br />the License Area. <br />c) Maintain effective Sediment control BMPs along the entire perimeter of the License <br />Area, at all adjacent storm drain inlets, and on all non -active slopes, as appropriate. <br />d) Sweep the street, sidewalk, and parkway adjacent to the License Area at the end of <br />the working day and prior to forecasted rain events. <br />e) Use a dmnpster or appropriate waste receptacle to discard of all trash and debris. <br />Dumpsters and waste receptacles shall be covered prior to the onset of precipitation. <br />f) Implement Wind Erosion Control BMPs (dust control), as appropriate, per the WE-1 <br />detail provided in the California Stormwater Quality Association (CASQA) <br />Stormwater BMP Handbook for Construction. <br />g) Remove graffiti on the fence or green screen within one (1) day of notification by the <br />City. <br />h) Repair vandalism to fence or green screen within one (1) day of notification by the <br />City. <br />i) Remove weeds or vegetation growing within License Area or around perimeter within <br />seven (7) days of notification by the City. <br />Within fourteen (14) days of vacating the License Area, the Licensee shall clean up the License <br />Area as outlined below: <br />a) Remove all trash, debris, sediment, stockpiles, and construction materials from the <br />License Area. <br />b) Remove old and/or damaged sediment control BMPs from the License Area and <br />install new sediment control BMPs along the entire perimeter of the License Area. <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.