Laserfiche WebLink
Planning and Building Agency <br />Planning Division <br />20 Civic Center Plaza <br />P.O. Box 1988 (M-20) <br />Santa Ana, CA 92702 <br />(714) 647-5804 <br />I. OWNER/APPLICANT <br />APPEAL APPLICATION <br />Applicant Supporters Alliance for Environmental Responsibility (SAFER), represented by Lozeau Drury LLP <br />1939 Harrison Street, Suite 150, Oakland CA 94612 <br />Mailing Address <br />Legal Owner Name: <br />Full name of Person, Firm, or Corporation (510 ) 836-4200 <br />Area Code Phone No. <br />Legal Owner Address: <br />Phone No.: ( ) ( ) Fax: ( ) <br />II. PROPERTY INFORMATION <br />Land Use Commercial office buildings Professional (P) District Center - Medium (DC-3) <br />Existing Land Use of Property and/or Building Zoning District General Plan Designation <br />Location 1901 and 1971 East Fourth Street and 515 and 525 North Cabrillo Park Drive <br />Street Address Name of Nearest Intersecting Street <br />SEE REVERSE SIDE FOR SUBMITTAL REQUIREMENTS <br />III. REASON FOR REQUEST <br />In the following provided space, please clearly specify and explain the error(s) of decision or <br />requirement upon which you are basing this appeal. (If additional space is needed, please attach <br />additional comments to the back of this application.) <br />The April 24, 2023 decision of the Planning Commission to approve Site Plan Review No. 2023-01 and Tentative <br />Tract Map No. 2023-03 for the proposed Cabrillo Town Center Project is in violation of the California Environmental <br />Quality Act ("CEQX). The city staffs determination that the Project was analyzed in the 2010 Metro East Mixed Use <br />Overlay Zone Environmental Impact Report and 2018 Subsequent EIR (collectively, "MEMU EIR") is incorrect. The <br />proposed Project will have new and different significant environmental impacts that were not analyzed in the MEMU EIR. <br />A project -specific EIR should have been prepared to analyze the Project and mitigate its impacts, and the Planning <br />Commission should have declined to approve the project until proper CEQA review was complete. <br />it May 1 2023 <br />Applicant's Signature: Date: <br />APPEAL APPLICATION NO. <br />cm\cntr-frm\appeal <br />5/00 City Council 18 — 15 10/3/2023 <br />