My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/03/2023 Regular
>
Item 18 - Appeal Application Nos. 2023-02 and 2023-03 for Cabrillo Town Center project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/3/2023 11:38:41 AM
Creation date
10/3/2023 9:16:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Item #
18
Date
10/3/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1768
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appeal — Cabrillo Town Center Mixed -Use Development Project <br />May 3, 2023 <br />Page 6 of 12 <br />• Hard hats, head coverings, sweat, dirt, sunscreen or any <br />other cosmetics must be removed on the forehead before <br />temperature screening. <br />• Anyone who refuses to submit to a temperature screening or <br />does not answer the health screening questions will be <br />refused access to the Project Site. <br />• Screening will be performed at both entrances from 5:30 am <br />to 7:30 am.; main gate [ZONE 1] and personnel gate <br />[ZONE 2] <br />• After 7:30 am only the main gate entrance [ZONE 1] will <br />continue to be used for temperature testing for anybody <br />gaining entry to the project site such as returning personnel, <br />deliveries, and visitors. <br />• If the digital thermometer displays a temperature reading <br />above 100.0 degrees Fahrenheit, a second reading will be <br />taken to verify an accurate reading. <br />• If the second reading confirms an elevated temperature, <br />DHS will instruct the individual that he/she will not be <br />allowed to enter the Project Site. DHS will also instruct the <br />individual to promptly notify his/her supervisor and his/her <br />human resources (HR) representative and provide them with <br />a copy of Annex A. <br />Planning <br />• Require the development of an Infectious Disease <br />Preparedness and Response Plan that will include basic <br />infection prevention measures (requiring the use of personal <br />protection equipment), policies and procedures for prompt <br />identification and isolation of sick individuals, social <br />distancing (prohibiting gatherings of no more than 10 <br />people including all -hands meetings and all -hands lunches) <br />communication and training and workplace controls that <br />meet standards that may be promulgated by the Center for <br />Disease Control, Occupational Safety and Health <br />City Council 18 — 23 10/3/2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.