On -Cali Public Works CM & Inspection
<br />Long Beach, CA
<br />Client: City of Long Beach
<br />Contact: Eric 0, Lopez, Public Works Director; 562.570.5690;
<br />Eric,LopezC long beach. gov
<br />Services: PM, CM, Inspection
<br />Start: 08/2016 Complete: Ongoing Project Value: $30M
<br />Ardurra is providing the City with on -call CM and inspection
<br />services geared toward a wide range of public works projects, from
<br />street rehabilitation to storm drains. Example projects include:
<br />■ Belmont Myrtha Pool Repairs, Phase 1 & 2. CM services
<br />to oversee $2.6M construction activities for the maintenance
<br />and repairs required to address deteriorated pool amenities
<br />and to ensure continued operation. Improvements for both
<br />phases include spalled and cracked deck concrete; exposed
<br />deck reinforcing steel; spalled and cracked concrete stair
<br />treads; corroded stair steel pans; corroded stair steel
<br />structural support; upgraded drainage system; removal and
<br />replacement of existing bleachers; removal and replacement
<br />of damaged concrete deck; and removal and replacement of
<br />existing corroded fencing.
<br />■ 3rd and Broadway Cycle Track. The City of Long
<br />Beach has led Southern California in building innovative,
<br />bike -friendly roadways. Ardurra helped the City improve
<br />the safety and convenience of two existing protected bike
<br />lanes (called cycle tracks), each about one mile long, in
<br />Downtown Long Beach passing through the city's core.
<br />The area is home to dozens of businesses, restaurants,
<br />hotels, condos, homes, police station, churches, libraries,
<br />parking structures and new developments. Before this
<br />project, the cycle tracks ran along the left-hand sides of
<br />two busy one-way streets, 3rd Street and one block south,
<br />Broadway. Now, each cycle track will be moved to the right
<br />side of the road, where drivers anticipate seeing bicyclists.
<br />ACEC California recognized this project with a 2020
<br />Engineering Excellence Award.
<br />■ Daisy -Myrtle Bicycle Boulevard. Managed construction of
<br />this 9,5-mile, north -south bikeway extending from downtown
<br />Long Beach to north Long Beach. This project, part of
<br />the City's Bicycle Master Plan, creates a safer way for
<br />cyclists to reach the Wrigley, Los Cerritos and Bixby Knolls
<br />neighborhoods. The Class 1 bike path bikeway runs along
<br />Daisy Avenue to the south and Myrtle Avenue to the north.
<br />ACEC California recognized this project with a 2019
<br />Engineering Excellence Award.
<br />■ Seaside Way Pedestrian Bridge. Project and construction
<br />management and inspection services on this 605-foot-long
<br />pedestrian bridge spanning East Seaside Way. The bridge
<br />shortened the walk from the Long Beach Convention Center
<br />walkway near Pine Avenue to the Long Beach Performing
<br />Arts Center. Beyond function, the bridge sports a breaking
<br />wave -inspired design and includes a deck, canopy of LED
<br />lights, seating and landscaping. This project was awarded
<br />the 2017 APWA BEST Project Award for Traffic, Mobility
<br />and Beautification and the 2018 Engineering Excellence
<br />Award at the state and local levels by the ACEC.
<br />■ Drake Soccer Field Project. CM for $3.8M completion
<br />of two soccer fields, a basketball court, parkway with trail,
<br />parking lot, new lighting and landscaping. In addition to
<br />providing the community with a new recreational area, the
<br />project conserved energy and reduced waste by using a
<br />significant percentage of recycled construction materials,
<br />drought -tolerant landscaping and by separating and
<br />recycling at least 60% of all construction debris.
<br />■ Rainbow Harbor Commercial Sewage EVAC System
<br />Replacement. CM for $700,000 replacement of 20-year
<br />sewage EVAC pump -out that serves the vessel operators at
<br />Rainbow Harbor, Oversaw such tasks as abandonment of
<br />the previous pump -out system, valve installation and hose
<br />replacement.
<br />■ Beach Maintenance Clarifier Project. CM & inspection
<br />for installation of a water recovery system that collects and
<br />treats wastewater overflow.
<br />On -Call Construction Management/Engineering
<br />SupportlTesting and Inspection Services
<br />Cypress, CA
<br />Client: City of Cypress
<br />Contact: Nick Mangkalakiri, City Engineer; 714.229.6729;
<br />nmangkal@cypressca.org
<br />Services, CM, Inspection, Engineering Support
<br />Start: 06/2022 Complete: Ongoing Project Value: $2.2M
<br />Ardurra provides professional construction management/testing
<br />and inspection/engineering support services, on an "as- needed"
<br />basis for various CIP projects. Construction management services
<br />include construction management, pre -construction meetings,
<br />utility coordination, monitoring of construction schedules, shop
<br />drawing review, submittal review, public notification, public
<br />complaint resolution, traffic coordination, coordination with other
<br />City departments, interpretation of PSE, analysis of changed
<br />conditions, development of corrective actions, and negotiation
<br />of change orders. Testing and inspection services include
<br />construction inspection, QAIQC, GPS enabled site photography,
<br />field visits, pre -construction job walks, emergency and night
<br />inspections, material and laboratory testing, structural calculations
<br />geotechnical investigations, potholing, exploratory investigations,
<br />and underground utility research.
<br />Proposal I City of Santa Ana 1 08-08-2023
<br />/\\,1. ARDURRA