Laserfiche WebLink
On -Cali Public Works CM & Inspection <br />Long Beach, CA <br />Client: City of Long Beach <br />Contact: Eric 0, Lopez, Public Works Director; 562.570.5690; <br />Eric,LopezC long beach. gov <br />Services: PM, CM, Inspection <br />Start: 08/2016 Complete: Ongoing Project Value: $30M <br />Ardurra is providing the City with on -call CM and inspection <br />services geared toward a wide range of public works projects, from <br />street rehabilitation to storm drains. Example projects include: <br />■ Belmont Myrtha Pool Repairs, Phase 1 & 2. CM services <br />to oversee $2.6M construction activities for the maintenance <br />and repairs required to address deteriorated pool amenities <br />and to ensure continued operation. Improvements for both <br />phases include spalled and cracked deck concrete; exposed <br />deck reinforcing steel; spalled and cracked concrete stair <br />treads; corroded stair steel pans; corroded stair steel <br />structural support; upgraded drainage system; removal and <br />replacement of existing bleachers; removal and replacement <br />of damaged concrete deck; and removal and replacement of <br />existing corroded fencing. <br />■ 3rd and Broadway Cycle Track. The City of Long <br />Beach has led Southern California in building innovative, <br />bike -friendly roadways. Ardurra helped the City improve <br />the safety and convenience of two existing protected bike <br />lanes (called cycle tracks), each about one mile long, in <br />Downtown Long Beach passing through the city's core. <br />The area is home to dozens of businesses, restaurants, <br />hotels, condos, homes, police station, churches, libraries, <br />parking structures and new developments. Before this <br />project, the cycle tracks ran along the left-hand sides of <br />two busy one-way streets, 3rd Street and one block south, <br />Broadway. Now, each cycle track will be moved to the right <br />side of the road, where drivers anticipate seeing bicyclists. <br />ACEC California recognized this project with a 2020 <br />Engineering Excellence Award. <br />■ Daisy -Myrtle Bicycle Boulevard. Managed construction of <br />this 9,5-mile, north -south bikeway extending from downtown <br />Long Beach to north Long Beach. This project, part of <br />the City's Bicycle Master Plan, creates a safer way for <br />cyclists to reach the Wrigley, Los Cerritos and Bixby Knolls <br />neighborhoods. The Class 1 bike path bikeway runs along <br />Daisy Avenue to the south and Myrtle Avenue to the north. <br />ACEC California recognized this project with a 2019 <br />Engineering Excellence Award. <br />■ Seaside Way Pedestrian Bridge. Project and construction <br />management and inspection services on this 605-foot-long <br />pedestrian bridge spanning East Seaside Way. The bridge <br />shortened the walk from the Long Beach Convention Center <br />walkway near Pine Avenue to the Long Beach Performing <br />Arts Center. Beyond function, the bridge sports a breaking <br />wave -inspired design and includes a deck, canopy of LED <br />lights, seating and landscaping. This project was awarded <br />the 2017 APWA BEST Project Award for Traffic, Mobility <br />and Beautification and the 2018 Engineering Excellence <br />Award at the state and local levels by the ACEC. <br />■ Drake Soccer Field Project. CM for $3.8M completion <br />of two soccer fields, a basketball court, parkway with trail, <br />parking lot, new lighting and landscaping. In addition to <br />providing the community with a new recreational area, the <br />project conserved energy and reduced waste by using a <br />significant percentage of recycled construction materials, <br />drought -tolerant landscaping and by separating and <br />recycling at least 60% of all construction debris. <br />■ Rainbow Harbor Commercial Sewage EVAC System <br />Replacement. CM for $700,000 replacement of 20-year <br />sewage EVAC pump -out that serves the vessel operators at <br />Rainbow Harbor, Oversaw such tasks as abandonment of <br />the previous pump -out system, valve installation and hose <br />replacement. <br />■ Beach Maintenance Clarifier Project. CM & inspection <br />for installation of a water recovery system that collects and <br />treats wastewater overflow. <br />On -Call Construction Management/Engineering <br />SupportlTesting and Inspection Services <br />Cypress, CA <br />Client: City of Cypress <br />Contact: Nick Mangkalakiri, City Engineer; 714.229.6729; <br />nmangkal@cypressca.org <br />Services, CM, Inspection, Engineering Support <br />Start: 06/2022 Complete: Ongoing Project Value: $2.2M <br />Ardurra provides professional construction management/testing <br />and inspection/engineering support services, on an "as- needed" <br />basis for various CIP projects. Construction management services <br />include construction management, pre -construction meetings, <br />utility coordination, monitoring of construction schedules, shop <br />drawing review, submittal review, public notification, public <br />complaint resolution, traffic coordination, coordination with other <br />City departments, interpretation of PSE, analysis of changed <br />conditions, development of corrective actions, and negotiation <br />of change orders. Testing and inspection services include <br />construction inspection, QAIQC, GPS enabled site photography, <br />field visits, pre -construction job walks, emergency and night <br />inspections, material and laboratory testing, structural calculations <br />geotechnical investigations, potholing, exploratory investigations, <br />and underground utility research. <br />Proposal I City of Santa Ana 1 08-08-2023 <br />/\\,1. ARDURRA <br />