My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - King Street Urban Greening Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/17/2023 Regular
>
Item 18 - King Street Urban Greening Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:13:14 PM
Creation date
10/11/2023 3:18:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
10/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 23-6625 <br />KING STREET URBAN GREENING PROTECT <br />PIP,PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: C - � • UO riS v <br />REQUIREMENT: <br />ADDENDUM NO. 1 <br />PROJECT NO.23-6625 <br />Exhibit A <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price_ . <br />i Amount <br />I <br />Clearing and Grubbing <br />1 <br />L5 <br />21Unclassifiied <br />3 <br />Excavation* <br />i Remove Guardrail <br />500 <br />40 <br />Cy <br />LF <br />" "� <br />I <br />$ , <br />$ o 2- • 00 <br />4 <br />NOT USED <br />0 <br />EA <br />$o <br />$o <br />a Remove Gates and Chain Link <br />Fence (Including Vines) <br />i <br />P <br />$[j <br />Ei� J! <br />g �1 '�V <br />Salvage <br />� <br />Survey Fin and Adjust <br />to Grade <br />I <br />1 <br />LS <br />LS <br />$ � 641. 10 <br />� <br />$ <br />7 <br />_� ._ ....._ <br />Trim Tree and Root Shaving <br />Crushed Rock or <br />8 <br />i <br />9 <br />Pervious Pavement, Infiltration, <br />and I31Oteterlt101i Systems) <br />Pervious Concrete Paving <br />420 <br />_ <br />2,480 <br />CY <br />SF <br />�17r•�✓ <br />i $ 24 " TZ i <br />/ <br />p�UfV•7J1I i <br />$ E00l a 00 <br />10 <br />_ <br />Curb Ramp per C.S,A, Std. <br />1122 <br />Curb and Gutter per C.S.A. <br />SOo <br />SF <br />$ ��h <br />..—1 <br />$ J 340 • �V <br />11 <br />(?-81o1, <br />A <br />330 <br />LF <br />$ j'�• �� ; <br />d 12 I <br />b Mow Curb <br />�- <br />964 <br />�V <br />LF <br />$ <br />Midwest Guardrail System <br />Standard Railing per i. <br />13 <br />CALTRANS Std. A77LZ with ! <br />190 <br />LF <br />$ o <br />� • � <br />$ f _ (%�} <br />G _ <br />circle Reflectors <br />I <br />P-1 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.