My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 18 - King Street Urban Greening Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/17/2023 Regular
>
Item 18 - King Street Urban Greening Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:13:14 PM
Creation date
10/11/2023 3:18:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
18
Date
10/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM NO.1 <br />PROPOSALPROJECT NO. 23-6625 <br />PROJECT NO.: 23-6625 <br />KING STREET URBAN GREENING PROJECT <br />Item . Description <br />P i <br />51 lhgh Block Wall per <br />331 SPPWC Std. 601-5 <br />6" AC Over Compacted <br />34 Material (Includes Slot Patch)200 <br />F. <br />Qty <br />24 <br />T <br />Unit <br />LF <br />TON <br />n� <br />❑nit Price <br />$ L 13 - 01 <br />$'ZOf ?j • <br />Amount <br />j S (7- p 7-101 . q0 <br />��`` T <br />$V i4� <br />Waste Receptacle Pad with <br />35 Anti -Littering Signage (Waste <br />Race Iles Provided by City) <br />36 ;Interpretive Sign <br />3 <br />1 <br />EA <br />EA <br />$ q tq � <br />_ <br />Artesia <br />($�r j (� -� (� <br />$j I Z - 5 C7 <br />f <br />Pilar Sign (by <br />37 <br />Contractor) - <br />i <br />EA <br />$ � '• � <br />$ ! 0, 1?- -.50 <br />_ <br />38 Community Art Moral (by <br />Artist) <br />1 <br />LS <br />$27,867.00 <br />r <br />$27,8b7.OQ ! <br />39 > Artesia Pila Si @y Artist } �` <br />j 40 Wall Stucco Preparation <br />` 1 <br />600 <br />LS <br />SF <br />$20,550.00 <br />$ Z • -I 1 <br />l $20 550.00 <br />$ it q ! • 00 <br />41 Utility Box Wrapping <br />r 2 <br />_ <br />EA <br />$ It �45.00 <br />$ 551 71q0.00 1 <br />! Signing m W Striping (Includes <br />42 E Removal of Existing <br />Strilsirts�'Pavement. � <br />1 <br />LS <br />$ � 9 . C <br />1 (b <br />$ J q ('1 - 05 <br />43 ! Wayftodhtg Sign <br />l <br />EA <br />$ <br />$ <br />I 44 ¢ Landscape and Irrigation. <br />1 <br />LS <br />$ I Iq f 01S _06 <br />$ f # q! 0 1,5 + 00 <br />t 45 i 90-Day Landscape <br />( Establishment <br />1 <br />46 Lighting and Electrical Service <br />i <br />LS <br />$ Jodi o . <br />$01 k75 <br />1 47 Adjust Water Valve to Grade <br />5 <br />EA <br />$ <br />$ ,iM <br />[_ <br />4$ New Water Meter and Adjust <br />to Grade <br />1 <br />EA <br />$ St iN2-50 <br />49 ' Adjust Pullbox to Grade <br />1 <br />EA <br />$ <br />f 2 <br />50 Adjust Manhole to Grade <br />1 ? <br />EA <br />q,q3 <br />51 As -,Built Plans <br />_._ <br />1 <br />LS <br />$5,000 <br />$5,000 <br />_ <br />52 Construct -son Perrtutµ <br />1 <br />LS <br />$12,452 <br />$12,452 <br />R•3 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.