My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 17 - Countywide Signal Synchronization Baseline Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/17/2023 Regular
>
Item 17 - Countywide Signal Synchronization Baseline Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:12:47 PM
Creation date
10/11/2023 3:18:14 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
17
Date
10/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 <br />25 <br />26 <br />COOPERATIVE AGREEMENT NO. C-3-2433 <br />COUNTYWIDE SIGNAL SYNCHRONIZATION BASELINE PROJECT <br />ARTICLE 2. SCOPE OF AGREEMENT <br />This Agreement specifies the roles and responsibilities of the Parties as they pertain to the <br />subjects and PROJECT addressed herein. The Parties agree that each will cooperate and coordinate <br />with the other Party in all activities covered by this Agreement and any other supplemental agreements <br />that may be required to facilitate purposes thereof. <br />ARTICLE 3. RESPONSIBILITIES OF AUTHORITY <br />The AUTHORITY, as the lead agency, agrees to the following responsibilities for the <br />implementation of the PROJECT: <br />A. To designate a Project Manager as a single point of contact for the Project. <br />B. The AUTHORITY, or agents of the AUTHORITY, shall manage, procure, implement, and <br />complete all aspects of the PROJECT, including filing all documentation necessary to comply with the <br />Congestion Mitigation and Air Quality (CMAQ) funding for the PROJECT. <br />C. The AUTHORITY, or agents of the AUTHORITY, shall coordinate outreach with the <br />PARTICIPATING AGENCY for the PROJECT. <br />D. The AUTHORITY, or agents of the AUTHORITY, shall collect all data necessary to <br />provide new optimized timing plans including, but not limited to, manual or video all movement counts at <br />each PROJECT signalized intersection, and a mutually agreed upon number and location of 24 hours <br />7 days automated machine traffic counts with vehicle classification. <br />E. The AUTHORITY, or agents of the AUTHORITY, shall develop and implement new timing <br />plans optimized for signal synchronization. <br />F. The AUTHORITY, or agents of the AUTHORITY, shall provide updated timing plans for <br />all control systems and all relevant data used to develop said plans to the PARTICIPATING AGENCY. <br />G. The AUTHORITY, or agents of the AUTHORITY, shall prepare a conceptual plan for the <br />delivery of the PROJECT. The AUTHORITY, or agents of the AUTHORITY, shall provide all reports to <br />the PARTICIPATING AGENCY in draft and final formats for review and comment. The PARTICIPATING <br />AGENCY comments shall be noted in the final report. <br />Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.