My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Award Construction Contract for the 17th Street Rehabilitation from Fairview Street to Flower Street Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/17/2023 Regular
>
Item 19 - Award Construction Contract for the 17th Street Rehabilitation from Fairview Street to Flower Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:13:48 PM
Creation date
10/11/2023 3:19:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
10/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT TITLE: <br />17th Street Rehabilitation: Bristol to <br />Flower <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP A <br />N <br />AGENCY: <br />Public Works <br />CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within this <br />segment of roadway. <br />EXHIBIT 5 <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has been <br />developed to prioritize and recommend the most cost-effective roadway <br />repairs, and maximize the return from available funding for street <br />pavement. This segment of 17th Street pavement rehabilitation is <br />identified as a high priority in the PMP. <br />PROJECT COSTS FY 23124 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Construction 335,990 - - - - - - <br />Engineering - <br />TOTAL 335,990 - - - - - <br />SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />RMRA SB1 335,990 - - - - - - <br />TOTAL 335,990 - - - - - - <br />DIVISION: <br />Design Engineering <br />CONTACT: <br />Sean Thomas, Senior Civil Engineer <br />DATE: <br />17-Oct-2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.