My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 19 - Award Construction Contract for the 17th Street Rehabilitation from Fairview Street to Flower Street Project
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/17/2023 Regular
>
Item 19 - Award Construction Contract for the 17th Street Rehabilitation from Fairview Street to Flower Street Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2023 4:13:48 PM
Creation date
10/11/2023 3:19:38 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
19
Date
10/17/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 2 <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NOS.: 21-6980, 21-6979 <br />17TH STREET REHABILITATION <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: All American Asphalt <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation <br />450 <br />CY <br />$ <br />$ <br />410.00 <br />184,500.00 <br />2 <br />Cold Mill (1.5")* <br />306,770 <br />SF <br />$ 0.40 <br />$122, <br />708.00 <br />3 <br />A.C. Pavement* <br />1,640 <br />TN <br />$ <br />$ <br />119.00 <br />195,160.00 <br />4 <br />Asphalt Rubber Hot Mix* <br />1,800 <br />TN <br />$ <br />$ <br />141.00 <br />253,800.00 <br />5 <br />Rubberized Emulsion <br />310 <br />TN <br />$ <br />$ <br />Aggregate Slurry (REAS) <br />781.00 <br />242,110.00 <br />Type III <br />6 <br />Crack Sealing <br />1 <br />LS <br />$ <br />$ <br />18,100.00 <br />18,100.00 <br />7 <br />PCC Sidewalk (4") <br />7,800 <br />SF <br />$ <br />$ <br />14.00 <br />109,200.00 <br />8 <br />PCC Curb Ramp <br />3,400 <br />SF <br />$ <br />$ <br />37.00 <br />125,800.00 <br />9 <br />PCC Curb and Gutter <br />2,350 <br />LF <br />$ <br />$ <br />(TypeA-2-8) <br />99.00 <br />232,650.00 <br />10 <br />PCC Cross Gutter <br />2,400 <br />SF <br />$ <br />$ <br />84,000.00 <br />35.00 <br />11 <br />PCC Commercial <br />500 <br />SF <br />$ <br />$ <br />Driveway Approach (8- <br />20.72 <br />10, 360.00 <br />inch Thick <br />12 <br />PCC Bus Pad <br />1,400 <br />SF <br />$ <br />$ <br />38.00 <br />53,200.00 <br />13 <br />Root Shave <br />9 <br />EA <br />$ <br />542.00 1$4,878.00 <br />P-1 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.