My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packet_2023-10-17
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
10/17/2023 Regular
>
Agenda Packet_2023-10-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2023 11:11:29 AM
Creation date
10/16/2023 10:57:57 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
10/17/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
721
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT 5 <br />CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT TITLE:PROJECT DESCRIPTION:PROJECT NEED: <br />King Street Urban Greening Project The King Street Urban Greening Project features the transformation of <br />approximately 9,000 square-feet of unused public space at the intersection <br />of King Street and 10th Street. The Project includes bicycle and <br />pedestrian pathways, drought tolerant landscaping, lighting, waste <br />receptacles, seating, interpretive signage, art installations, and a <br />stormwater infiltration system that will capture and infiltrate stormwater <br />runoff from the surrounding neighborhood. <br />The abandoned street area at the intersection of King Street and 10th Street <br />is unused and is subject to illegal dumping. The Project will beautify this <br />public space and provide benefits to the surrounding community. The Project <br />will also help improve water quality, enhance local water supply, and reduce <br />flooding via the infiltration of stormwater runoff . The Project connects the <br />Artesia Pilar neighborhood to Fairview Street via the installation of pedestrian <br />and bicycle pathways. <br />PROJECT CATEGORY: <br />Utility/Drainage/Lighting Improvements <br />Storm Drain/Water Quality <br />PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Construction 575,000 - <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />-TOTAL 575,000 <br />SOURCE OF FUNDS <br />DISTRICT 1 A&D FUND <br />FED CLEAN WATER <br />FY 23/24 <br />300,000 <br />275,000 <br />575,000 <br />FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />-TOTAL <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Craig Foster, NPDES Manager 20-Sep-2023 <br /> <br /> <br />City Council 18 – 20 10/17/2023
The URL can be used to link to this page
Your browser does not support the video tag.