My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ABAJIAN ENTERPRISE DBA SOCAL REMOVAL
Clerk
>
Contracts / Agreements
>
A
>
ABAJIAN ENTERPRISE DBA SOCAL REMOVAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 3:10:09 PM
Creation date
10/23/2023 1:38:51 PM
Metadata
Fields
Template:
Contracts
Company Name
ABAJIAN ENTERPRISE DBA SOCAL REMOVAL
Contract #
N-2023-275
Agency
Public Works
Expiration Date
9/1/2025
Insurance Exp Date
6/19/2024
Destruction Year
2030
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a� I SCOPE OF WORK <br />and the skills and training required to perform all services per Cal -OSHA <br />requirements. <br />b) Vehicles — Trucks / automobiles should be in good mechanical working <br />condition, clean in appearance, and clearly identifiable with the contractor's <br />name on vehicles. <br />c) All equipment shall be in good working order with all manufacturer safety guards <br />and devices in place. <br />d) The City has the option to purchase and provide materials. <br />5. Compliance with Applicable Laws and Regulations <br />a) Contractor shall perform all requirements under this contract in strict <br />observance of and compliance with all applicable traffic and safety laws, <br />regulations, ordinances, codes and any other legislative or statutory <br />requirements. <br />b) Contractor warrants that the performance of services under this contract shall <br />be compliant with the current requirements of the Occupational Safety and <br />Health Act (OSHA) and as it may be amended or updated throughout the term <br />of this contract. <br />6. Working Day <br />The Contractor activities shall be confined to the hours from 7:00 a.m. to 3:30 p.m., <br />Monday through Friday. Deviation from these hours will not be permitted without the <br />prior consent of the City's PM or designee, except in emergencies in involving <br />immediate hazard to persons or property. <br />7. Inspections <br />The City shall have the right to inspect any work performed to ensure that the work <br />is being and has been performed in accordance with the City's specifications and <br />applicable federal, state and/or local requirements, City Standard Plans and Details <br />(if applicable) and this agreement. All work found in such inspections not to conform <br />to the applicable requirements shall be corrected by the Contractor and the City shall <br />have the right to withhold payment to the Contractor until the work is corrected. <br />S. Protection of the Public and Damages to Existing Structures <br />a) The Contractor shall exercise caution at all times for the protection of persons <br />and property. All fines, penalties and/or repair charges resulting from the <br />Contractor's actions shall be the sole responsibility of the Contractor. <br />City of Santa Ana IFB No. 23-073 Page 13 of 26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.