My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Recognize Measure M2 Grant Funds and Amend the FY 23-24 CIP
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
09/19/2023 Regular
>
Item 11 - Recognize Measure M2 Grant Funds and Amend the FY 23-24 CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 11:39:40 AM
Creation date
10/24/2023 11:33:03 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
9/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 23/24CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />This project will widen Fairview between 17th Street and Trask <br />Street from 2 to 3 lanes in each direction. The project also includes <br />sidewalk, wheel chair ramps, raised medians, and Traffic Signal <br />modifications along Fairview Street between 17th Street and Trask <br />Street. <br />PROJECT NEED: <br />The MPAH (Master Plan of Arterial Highways) Strategic Plan Technical <br />Report identified the need for Fairview Street to be widened to a six- <br />lane major arterial to meet MPAH requirements. The existing Average <br />Daily Traffic (ADT) is in excess of 40,370 vehicles per day. The <br />proposed improvements will allow the segment to accommodate future <br />traffic volumes at a Level of Service C and increase operational <br />efficiency. <br />PROJECT TITLE: <br />Fairview Street Improvements from <br />17th to Trask <br />PROJECT CATEGORY: <br />Street Improvements <br />Street/Bridge Improvements & <br />Widening <br />LOCATION MAP <br />AGENCY:DIVISION:CONTACT:DATE: <br />Public Works CIP Engineering Gilbert Castillo, Senior Engineer 19-Sep-2023 <br />PROJECT COSTS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />Engineering 825,000 ------ <br />Other ------- <br />TOTAL 825,000 ------ <br />SOURCE OF FUNDS FY 23/24 FY 24/25 FY 25/26 FY 26/27 FY 27/28 FY 28/29 FY 29/30 <br />GAS TAX ------- <br />MEASURE M2 COMPETITIVE 825,000 ------ <br />TOTAL 825,000 ------ <br />EXHIBIT 3
The URL can be used to link to this page
Your browser does not support the video tag.