My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 14 - Award Construction Contract for Traffic Calming Improvements Phase 1
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
09/19/2023 Regular
>
Item 14 - Award Construction Contract for Traffic Calming Improvements Phase 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2023 11:51:35 AM
Creation date
10/24/2023 11:33:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
14
Date
9/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 23-6034 <br />TRAFFIC CALMING IMPROVEMENTS PHASE I <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Hardy & Harper, Inc. _ <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />l <br />Remove and Construct PCC <br />630 <br />SF <br />$ <br />Z5• a0 <br />S <br />150,750 <br />Sidewalk (T-r) <br />2 <br />Construct PCC Curb Ramp <br />525 <br />SF <br />S <br />+,•�, o0 <br />$ <br />21,coo <br />3 <br />Remove Fire Hydrant Assembly <br />3 <br />EA <br />$ <br />$ <br />12,oco • co <br />3to,OM <br />4 <br />Potholing (As -Needed)* <br />6 <br />EA <br />$ <br />S <br />800 • 00 <br />4. 800 <br />5 <br />Vertical Offset (As -Needed)* <br />3 <br />EA <br />S <br />S <br />3, 5co • od <br />10,500 <br />6 <br />Construct New Fire Hydrant <br />3 <br />EA <br />S <br />S <br />Assembly <br />2-5, 000. c+G <br />?5, 000 <br />7 <br />Install Raised Crosswalk at Adams <br />I <br />LS <br />$ <br />S <br />St and Artesia St <br />101000. 00 <br />10,000 <br />8 <br />Install Raised Crosswalk at Adams <br />1 <br />LS <br />S <br />S <br />St and Spruce St <br />10, 000• oo <br />lot coo <br />9 <br />Install Speed Cushions at <br />1 <br />LS <br />S <br />S <br />Grovemont St Between Tustin Ave <br />15 J 0O0 , 00 <br />I5, Coo <br />and Deodar St <br />10 <br />Install Speed Cushions at Cypress <br />I <br />LS <br />S <br />S <br />Ave Between Edinger Ave and St <br />25, 000 00 <br />2-5100O <br />Andrew PI <br />1 1 <br />Install Speed Cushions at Myrtle St <br />I <br />LS <br />$ <br />$ <br />Between Raitt St and Bristol St <br />20,C00 • e o <br />20, 000 <br />12 <br />Signing and Striping <br />I <br />LS <br />$ <br />$ <br />2-W) 46D • coo <br />9,02,450. <br />13 <br />Furnish & Install Complete <br />1 <br />LS <br />S <br />$ <br />Functioning Carmanah RRF8 <br />D ODa. <br />0t?D <br />System per Plan at the Intersection <br />00 <br />of Civic Center Dr and French St <br />P- l of P-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.