Laserfiche WebLink
Functional Specifications Development and SCADA Programming Services ENTERPRISE <br />EA Project Number: EA23CSA090, 0.0.0 AUTOMATION <br />+ ATET-H COM-Y <br />2.3 Project Team <br />EA's project methodology relies <br />heavily on a structured and <br />intentional staffing model. EA will <br />assign an Account Manager, <br />Project Technical Lead, and a <br />Project Manager to this contract. <br />Additionally, EA will assign <br />additional resources on an as - <br />needed basis depending on the <br />current project or support need. <br />Below is a table listing the <br />personnel that would be assigned <br />to the City's projects as required <br />and their percentage availability for <br />work associated with this contract. <br />EA will contact the City for approval <br />of any staff augmentations. <br />The Project Manager will be the <br />City's primary point of contact <br />throughout the life of this contract. <br />City of Santa Ana <br />kAvilaM) ;ZackAGentry rchitect) <br />Project Execution Team <br />Detailed resumes are provided in Appendix A Resumes. <br />2.4 Location <br />Our headquarters, where all engineering will be performed, <br />is located in Irvine, CA. This is the primary office location for <br />all 42 EA staff members, including 27 full-time degreed <br />engineers cross trained on all of the core technologies that <br />we specialize in. <br />