My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 09 - Construction Contract for Alton Avenue from Main to Standard Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/29/2023 Special
>
Item 09 - Construction Contract for Alton Avenue from Main to Standard Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 12:58:09 PM
Creation date
10/25/2023 12:39:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
9
Date
8/29/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT A <br />PROPOSAL <br />PROJECT NO.: 21-6975 <br />ALTON AVENUE REHABILITATION <br />FROM MAIN STREET TO STANDARD AVENUE <br />BID PROPUSAL <br />T0: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Hardy & Harper, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the speciFcations for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />unclassified Exravatian` <br />2,5o0 <br />CY <br />$ <br />$ <br />t;>oow� <br />2 <br />Cold Mil1(0-2")'` <br />67,000 <br />SF <br />$ <br />$ <br />UQ <br />00 <br />3 <br />AC Pavement' <br />3,100 <br />TN <br />$ <br />S <br />12L.110 <br />oa <br />4 <br />Asphalt Rubber Not Mix* <br />2,900 <br />TN <br />$ <br />$ <br />pp <br />on <br />5 <br />PcC Sidewalk (4")* <br />T800 <br />SF <br />$ <br />$ <br />CIO� <br />GO <br />64CominePCC <br />Driveway Approach <br />1,300 <br />SF <br />$rcial <br />= 8")* <br />7 <br />PCC Curb and Gutter (Type A-?- <br />600 <br />LF <br />$ <br />S <br />8)` <br />—75.00 <br />4E)Qmoa <br />8 <br />PCC Reinforced Bus Pad* <br />4,300 <br />SF <br />$ <br />$ <br />'2O.°° <br />ao <br />9 <br />Root Shave* <br />14 <br />EA <br />$ <br />$ <br />50 ao <br />to <br />Furnish and Install New Water <br />I I <br />EA <br />$ <br />$ <br />Meter Frame and Cover to Finished <br />oa <br />4 od <br />1 I <br />Grade* <br />Adjust Water Valve Frame and <br />26 <br />EA <br />$ <br />$ <br />Cover to Finished Grade* <br />tso <br />12 <br />Furnish and Install New Sewer and <br />7 <br />EA <br />$ <br />$ <br />Drainage Manhole to Finished <br />co <br />ao <br />13 <br />Grade* <br />Furnish and install New Pullbox` <br />1 <br />EA <br />$ <br />$ <br />op <br />,. 60 <br />P-7 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.