My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 09 - Construction Contract for Alton Avenue from Main to Standard Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/29/2023 Special
>
Item 09 - Construction Contract for Alton Avenue from Main to Standard Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 12:58:09 PM
Creation date
10/25/2023 12:39:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
9
Date
8/29/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 5 <br />PROJECT TITLE: <br />Alton Avenue Rehabilitation: Main to Standard <br />PROJECT CATEGORY: <br />Street Improvements <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />AGENCY: <br />Public Works <br />A <br />N <br />CITY OF SANTA ANA FY20/21CIP <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, gutters, <br />sidewalks, driveway approaches, and wheelchair ramps within <br />this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has been <br />developed to prioritize and recommend the most cost-effective <br />roadway repairs, and maximize the return from available funding <br />for street pavement. This segment of Alton Avenue pavement <br />rehabilitation is identified as a high priority in the PMP. <br />PROJECT COSTS FY 20121 FY 21122 FY 22123 FY 23/24 FY 24/25 FY 25/26 FY 26/27 <br />Construction $1,750,00 - - - - - - <br />TOTAL $1,750,00 - <br />SOURCE OF FUNDS FY20/21 <br />RMRA SB1 $1,750,00 <br />TOTAL $1,750,00 <br />DIVISION: <br />Design Engineering <br />FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25126 FY 26/27 <br />CONTACT: <br />Jason Gabriel, Principal Civil Engineer <br />DATE: <br />04-May-2020 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.