My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 09 - Construction Contract for Alton Avenue from Main to Standard Avenue
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/29/2023 Special
>
Item 09 - Construction Contract for Alton Avenue from Main to Standard Avenue
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 12:58:09 PM
Creation date
10/25/2023 12:39:15 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
9
Date
8/29/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 21-6975 <br />ALTON AVENUE REHABILITATION <br />FROM MAIN STREET TO STANDARD AVENUE <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Hardy & Harper, Inc <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation* <br />2,500 <br />CY <br />$ <br />$ <br />qG."o <br />7- 7-6. b CAD as <br />2 <br />Cold Mill (0-2")* <br />67,000 <br />SF <br />$ <br />$ <br />(.pQ <br />On <br />3 <br />AC Pavement* <br />2,100 <br />TN <br />$ <br />$ <br />l oa <br />o0 <br />4 <br />Asphalt Rubber Hot Mix* <br />2,900 <br />TN <br />$ <br />$ <br />yz.00 <br />co <br />5 <br />PCC Sidewalk (4")* <br />5,800 <br />SF <br />$ <br />$ <br />`,, <br />00 <br />6 <br />PCC Driveway Approach <br />1,300 <br />SF <br />$ <br />$ <br />(Commercial = 8")* <br />3-5,110 <br />45 Sn0 <br />7 <br />PCC Curb and Gutter (Type A-2- <br />600 <br />LF <br />$ <br />$ <br />8)* <br />-15.0° <br />4S oO <br />8 <br />PCC Reinforced Bus Pad* <br />4,300 <br />SF <br />S <br />$ <br />Zd °° <br />ao <br />9 <br />Root Shave* <br />14 <br />EA <br />S <br />$ <br />50,00 <br />--1 —I CyC 00 <br />10 <br />Furnish and Install New Water <br />I I <br />EA <br />S <br />$ <br />Meter France and Cover to Finished <br />Grade* <br />�p ao <br />o0 <br />1 I <br />Adjust Water Valve Frame and <br />26 <br />[A <br />S <br />$ <br />Cover to Finished Grade* <br />qo <br />00 <br />12 <br />Furnish and Install New Sewer and <br />7 <br />EA <br />5 <br />$ <br />Drainage Manhole to Finished <br />Grade* <br />Oo <br />°a <br />13 <br />Furnish and Install New Pullbox* <br />1 <br />EA <br />$ <br />$ <br />7-U 00 <br />P-7 of P-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.