My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 11 - Award Agreement to Athens Services to Provide Street Sweeping Services
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
08/29/2023 Special
>
Item 11 - Award Agreement to Athens Services to Provide Street Sweeping Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2023 12:53:05 PM
Creation date
10/25/2023 12:39:31 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
11
Date
8/29/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br /> <br /> <br />STREET SWEEPING SERVICES 17 <br /> <br /> <br /> <br />N. JOINT OFFERS/SUBCONSULTANTS <br />Where two or more Proposers desire to submit a single Proposal in response to this RFP, <br />they should do so on a prime sub-consultant basis. The City intends to contract with a single <br />firm and not with multiple firms doing business as a joint venture. Should the use of sub- <br />consultants be offered, the Proposer shall provide the same assurances of competence for <br />the sub-consultant plus the demonstrated ability to manage and supervise the subcontracted <br />work. Sub-consultants shall not be allowed to further subcontract with others for work under <br />the Agreement. The provisions of the Agreement shall apply to all sub-consultants in the <br />same manner as the Proposer. <br />The City reserves the right to reject, replace and approve any and all Subcontractors. All <br />Subcontractor(s) shall be identified in the response to the RFP and the City reserves the right <br />to reject any proposed Subcontractor(s). Subcontractors shall be the responsibility of the <br />prime Contractor and the City shall assume no liability of such Subcontractors. <br /> <br />O. LITIGATION STATUS <br />Each Proposer must include in its proposal a complete disclosure of any alleged significant <br />prior or ongoing contract failures, any civil or criminal litigation or investigation pending which <br />involves the Proposer or in which the Proposer has been judged guilty or liable. Failure to <br />comply with the terms of this provision will disqualify any proposal. The City reserves the <br />right to reject any proposal based upon the Proposer’s prior history with the City or with any <br />other party, which documents, without limitation, unsatisfactory performance, adversarial or <br />contentious demeanor, significant failure(s) to meet contract milestones or other contractual <br />failures. <br /> <br />P. NEGOTIATIONS <br />The City reserves the right to negotiate final contract terms with any Proposer selected. The <br />contract between the parties will consist of the RFP together with any modifications thereto, <br />and the awarded Contractor’s proposal, together with any modifications and clarifications <br />thereto that are submitted at the request of the City during the evaluation and negotiation <br />process. In the event of any conflict or contradiction between or among these documents, <br />the documents shall control in the following order of precedence: the final executed contract, <br />the RFP, any modifications and clarifications to the awarded Contractor’s proposal, and the <br />awarded Contractor’s proposal. Specific exceptions to this general rule may be noted in the <br />final executed contract. <br /> <br />Negotiations shall be confidential and not subject to disclosure to competing Contractors <br />unless and until an agreement is reached. If contract negotiations cannot be concluded <br />successfully, the City reserves the right to negotiate a contract with another Contractor or <br />withdraw the RFP. <br /> <br />Q. NON-PAYMENTS <br />Note that payments will NOT be made for any unsatisfactory work until corrected. In the event <br />of nonpayment of undisputed sums by the City, Contractor shall give the City thirty (30) <br />working days to cure the alleged breach. <br /> <br />R. OWNERSHIP OF DOCUMENTS <br />The City has permanent ownership of all directly connected and derivative materials produced <br />under this contract by the Contractor. All documents, reports and other incidental or derivative <br />work or materials furnished hereunder shall become and remains the sole property of the City <br />and may be used by the City as it may require without additional cost to the City. Contractor <br />shall provide the City copies of documents upon its request at any time. None of the documents,
The URL can be used to link to this page
Your browser does not support the video tag.