My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MOORE LACOFANO, GOLTSMAN, INC.
Clerk
>
Contracts / Agreements
>
M
>
MOORE LACOFANO, GOLTSMAN, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2024 10:56:18 AM
Creation date
10/26/2023 11:54:54 AM
Metadata
Fields
Template:
Contracts
Company Name
MOORE LACOFANO, GOLTSMAN, INC.
Contract #
A-2023-176
Agency
Planning & Building
Council Approval Date
10/17/2023
Expiration Date
10/31/2025
Insurance Exp Date
8/31/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />fee proposal <br />20 <br />$4800 <br />20 <br />$3500 <br />u Pro act Initiation antl Hi Meval Outline <br />t.z <br />BrieBn Pa er Summanzin Zonin State ies <br />24 <br />_ <br />5760 <br />32 <br />55,600 <br />is <br />Pro'ec[ Mana emen4 Pr0'ect Team Meetin s/Calls allowance <br />144 <br />$34,560 <br />216 <br />$37,800 <br />Historic COntezt antl Surve - CaOrtlinatian wiN ARG <br />t <br />$240 <br />4 <br />$700 <br />Subtoal <br />189 1 <br />$45.360 <br />272 <br />$47,600 <br />v <br />4VOnc Sco a Refinement and Kick-off Meeti <br />8 1 <br />$2 800 <br />23 <br />Bnefin Pa ron Interim Standards <br />8 1 <br />$1440 <br />12 <br />$21W <br />Subtoal <br />14 <br />$3,380 <br />28 <br />E4,900 <br />Task3 <br />3.1 <br />Literature Review and Summary Audit <br />Autlil of S ecia Area Plans antl Ci ide Desi n Guidelines <br />24 <br />$5 780 <br />40 <br />$7000 <br />a2 <br />Pre re Cam rehensive Titie 4l Autlit antlU ate Guidance Matrix <br />18 <br />$3840 <br />W <br />$B ]50 <br />Task <br />4 Public Strategy <br />SUGMeI <br />d0 <br />E9,e0o <br />80 <br />S'15,750 <br />4t <br />Engagement and Implementation <br />OeMon Public Involvement Plan <br />4 <br />$700 <br />4.3 <br />Stakehotler Interviews <br />24 <br />$4200 <br />24 <br />$4200 <br />"IMOU <br />W <br />$10500 <br />as <br />Wabsite Materials antl Content <br />8 <br />$1400 <br />4a <br />PudicOutreachSumma Re o05_ <br />8 <br />$1400 <br />Task 5: <br />Draft Zoning Code <br />Subtolal <br />108 1 <br />$25,920 <br />128 <br />$22,400 <br />5.1 <br />S le Sheet Format and Outline <br />2 <br />$480 <br />8 <br />$1400 <br />5.2 <br />sa <br />Admininstiative Draft Zonin Cotle Amendments (2 tlrafts) <br />Public Review Draft Zoning Cotle Amendments <br />_ <br />180 <br />$4$200 <br />400 <br />$70.000 <br />40 $9,600 fi0 <br />$10.500 <br />Task <br />: Draft and Final Maps <br />•pia <br />Subtotal <br />222 <br />$53280 <br />488 <br />$81,900 <br />set <br />ere Draft Zonin, Ma, <br />8 <br />$7 920 <br />24 <br />$4 200 <br />5132 <br />prepare Hearing Draft and Final Zoning Maps <br />6 <br />$1 440 1 <br />12 <br />1 $2,100 <br />Subtotal <br />14 <br />$3,330 1 <br />35 <br />an and <br />Task 6 <br />s.1 <br />Planning Commis ion City Council <br />Planni Commission antl Cif• Council Workshops <br />leach <br />18 <br />$3890 <br />S3,MO <br />16 <br />$2800 <br />ae <br />Planni Commission WOrksho s 2 <br />16 <br />16 <br />$28(10 <br />63 <br />Cifty, Council Workshops 2 <br />16 <br />$3 B40 <br />i6 <br />$2800 <br />Task 7: <br />•. Compliance <br />Subluall <br />48 IE11,520 <br />48 <br />E8,4W <br />71 <br />General Plan FEIR Addendum 2 rountls of reNew <br />4 <br />$Bfi0 <br />12 <br />$2100 <br />Task <br />SUMatal <br />4 <br />$Bfi0 <br />12 <br />82,100 <br />8: <br />8.i <br />Public Hearings <br />Plannin Commission Public Hearin s 2 <br />i6 <br />$3840 <br />16 <br />$2800 <br />82 <br />C Council Pubic Hearin s 2, <br />16 <br />83840 <br />1fi <br />52800 <br />Subtotal <br />32 <br />E7;S80 <br />32 <br />E5,800 <br />9.1 <br />Final Zonin Cotle ♦2 rountls of review <br />8 <br />$1920 <br />24 <br />$4 200 <br />9.2 <br />lAssemble Graphics Package <br />10 <br />2 <br />$350 <br />9.3 <br />FOrrflat antl Seltinos Manual _ _ <br />2 <br />$480 <br />6 <br />$1 050 <br />Task <br />' •• Training, and Contingency <br />SubtOlel <br />10 <br />52,400 <br />32 <br />E5,500 <br />and <br />, <br />Notice of Deteonination for CEOA Com liance <br />$0 <br />$o <br />Direct <br />Costs <br />Subtotal <br />0 <br />$0 <br />0 <br />EO <br />Subconsultent Expenses and Administration <br />Daft Code Pnnbng (allowance) <br />IOPTIONAL <br />sea <br />CBO Contract Mana ement estimate <br />sea <br />Ta sled Zoning Map Update Mailer Production estimate <br />m2 <br />ZOnIng Code Guide and Traini <br />2 <br />$480 <br />8 <br />$1 400 <br />tas <br />Six -Month Tune-ups allowance <br />24 <br />$5 ]60 <br />48 <br />$8400 <br />Staff Trainin Materials Pnnan allowance <br />Coordination with Corridor Plan consultant estimate <br />MIG, Inc. Menifee Development Code Fee Proposal <br />
The URL can be used to link to this page
Your browser does not support the video tag.