My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Item 25 - North East Annexation Water & Sewer Improvements
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2023
>
11/07/2023 Regular
>
Item 25 - North East Annexation Water & Sewer Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2023 2:43:55 PM
Creation date
11/1/2023 1:44:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25
Date
11/7/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA ADDENDUM NO. FOUR <br />PROPOSAL <br />PROTECT NO.: 21-6453 & 21-6619 <br />NE ANNEXATION WATER & SEWER IMPROVEMENTS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Mobilize/Demobilize (Max 5% of <br />total bid) <br />1 <br />LS <br />$ <br />-10 1 p l) D <br />$ <br />-70100 0 <br />2 <br />Traffic Control <br />1 <br />LS <br />S <br />$ <br />3 <br />Signing and Striping 1 <br />LS <br />$ <br />$ <br />aofo0C) <br />ao�o�o <br />$6,000 <br />4 <br />Construction Permit 1 <br />LS <br />$6,000 <br />5 <br />Install Speed Cushions at Deodar St <br />Between Avalon Ave and 171 St <br />1 <br />LS <br />$ <br />001©o o <br />$ <br />9-0 D O U <br />*6 <br />Cold Mill (2") <br />68,387 <br />SF <br />$ oo <br />$ <br />826 <br />*7 <br />Asphalt Rubber Hot Mix (ARI-IM) <br />TN <br />S <br />$ <br />t-7 O <br />I <br />*8 <br />PCC Sidewalk (T=4") per City Std. <br />2,493 <br />SF <br />$ <br />r $ <br />1104 <br />D4, <br />&d-j V-S� <br />*9 <br />PCC Driveway Approach (T=6") <br />City Std. 1112 <br />1,988 <br />SF <br />$ <br />S(� <br />per <br />*10 <br />PCC Curb & Gutter (A-2-6) per <br />1,281 <br />LF <br />$ <br />$ <br />City Std. 1101 <br />SIB a-y b <br />11 <br />Adjust Water Valve Frame & Cover <br />11 <br />EA <br />S <br />$ <br />1b,S-0 e <br />(sow <br />12 <br />Adjust Manhole Frame & Cover <br />8 <br />EA <br />$ as <br />$ % 6l 00 Q <br />13 <br />6" DR-14 PVC Water Main per <br />detail on plans <br />5 <br />LF <br />$ <br />$ <br />D <br />P-1 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.