Laserfiche WebLink
PROJECT SCHEDULE <br />RCS' references will attest that our timelines are ideal for impact fee studies. This schedule, <br />of course, will require the cooperative participation of City staff. We will be having meetings <br />with staff every two to three weeks and provide them with updates. Department meetings <br />will be 30 minutes to two hours each. <br />RCS will comply with local, county, and state protocols for safely conducting meetings as the <br />COVID-19 pandemic evolves. <br />Development Impact Fee Study 0� Nov I Dec I Jan Feb Mar Apr <br />2023 2023 1 2024 1 2024 2024 1 2024 <br />Land -use Database Compilation <br />Determine Infrastructure LOS <br />Discuss Desired Projects w. Staff <br />Review Project Costs & Descriptions <br />Review Demand Drivers (Nexus) <br />Apply Nexus Distribution Factors <br />Review Draft DIF Report with Staff <br />Prepare Final DIF Report <br />Proposal for the City of Santa Ana, CA <br />Page 14 <br />