Laserfiche WebLink
COOPERATIVE AGREEMENT NO. C-3-2433 <br />COUNTYWIDE SIGNAL SYNCHRONIZATION BASELINE PROJECT <br />1 H. The AUTHORITY shall provide oversight to maintain inter -jurisdictional traffic signal <br />2 operational integrity between the PROJECT and other signal synchronization projects not olderthan three <br />3 (3) years from the effective date of this Agreement. <br />4 I. The AUTHORITY shall provide formats, templates, and guidance in reporting <br />5 requirements necessary for the PROJECT. <br />6 J. The AUTHORITY, or agents of AUTHORITY, under this Agreement and upon closeout of <br />7 PROJECT, may perform a technical and/or field review to ensure that the CMAQ guidelines, policies, and <br />8 procedures were followed. <br />9 ARTICLE 4. RESPONSIBILITIES OF THE PARTICIPATING AGENCY <br />10 The PARTICIPATING AGENCY agrees to the following responsibilities for implementation of <br />11 the PROJECT: <br />12 A. The PARTICIPATING AGENCY shall provide a technical representative to meet and <br />13 participate as a member of the PROJECT's Traffic Forum. <br />14 B. The PARTICIPATING AGENCY shall authorize the AUTHORITY to manage, procure, <br />15 and implement all aspects of the PROJECT. <br />16 C. The PARTICIPATING AGENCY shall participate and support the PROJECT <br />17 implementation. <br />18 D. The PARTICIPATING AGENCY shall provide the AUTHORITY, or agents of the <br />19 AUTHORITY, all current intersection as -built drawings, all current intersections controller assembly <br />20 plans as provided by the manufacturer and modified by the PARTICIPATING AGENCY since original <br />21 installation, local field master, local controller, Advanced Traffic Management System timing plans, <br />22 and other ITS -related data upon request. <br />23 E. The PARTICIPATING AGENCY shall inform the AUTHORITY of new traffic signal <br />24 installations and any traffic signal modifications, which would materially affect the performance of the <br />25 regional corridors on the PROJECT. <br />26 I <br />Page 5 of 10 <br />